Flood control developments on the Neuf Fontaines Creek — construction phase (Q3696410): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Following major flooding in January 2009, a hydraulic study of the watershed of Neuf Fontaines Creek defined a protection plan for the commune of Réhon.This operation consists of the following flood control projects: implementation of shoreline renaturation and consolidation work, a trap with jams, and resising a portion of the lineline covered by the creek in the Rehon crossing., translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Flood control developments on the Neuf Fontaines Creek — construction phase

Revision as of 10:38, 22 November 2021

Project Q3696410 in France
Language Label Description Also known as
English
Flood control developments on the Neuf Fontaines Creek — construction phase
Project Q3696410 in France

    Statements

    0 references
    130,345.0 Euro
    0 references
    619,326.0 Euro
    0 references
    21.05 percent
    0 references
    1 February 2016
    0 references
    31 December 2018
    0 references
    Syndicat Mixte/Syndicat Intercommunal d’Aménagement de la Chiers et de ses affluents
    0 references
    A la suite d'importantes inondations en janvier 2009, une étude hydraulique du bassin versant du ruisseau de Neuf Fontaines a défini un programme d'aménagement de protection de la commune de Réhon.La présente opération consiste à réaliser des aménagements de lutte contre les inondations suivants : mise en oeuvre de travaux de renaturation et de confortement des berges, piège à embâcles, et redimensionnement d'une partie du linéaire couvert du ruisseau dans la traversée de Réhon. (French)
    0 references
    Following major flooding in January 2009, a hydraulic study of the watershed of Neuf Fontaines Creek defined a protection plan for the commune of Réhon.This operation consists of the following flood control projects: implementation of shoreline renaturation and consolidation work, a trap with jams, and resising a portion of the lineline covered by the creek in the Rehon crossing. (English)
    22 November 2021
    0 references

    Identifiers

    LO0005755
    0 references