Reinforcement of the “Delta” strap, runoff water treatment & replacement of signage (Q3685116): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q3771823 / rank
 
Normal rank

Revision as of 16:58, 24 November 2021

Project Q3685116 in France
Language Label Description Also known as
English
Reinforcement of the “Delta” strap, runoff water treatment & replacement of signage
Project Q3685116 in France

    Statements

    0 references
    1,190,000.0 Euro
    0 references
    1,700,000.0 Euro
    0 references
    70.0 percent
    0 references
    1 January 2017
    0 references
    30 November 2019
    0 references
    SOCIETE AEROPORTUAIRE GUADELOUPE PÔLE CARAIBES
    0 references
    0 references
    Pour offrir aux passagers les services d'un grand aéroport international et s'adapter aux évolutions du trafic, la société aéroportuaire s'est lancée dans un grand projet d'extension et de reconfiguration de son aérogare. Le projet général consiste à mettre aux normes les infrastructures existantes et à les adapter à l’accueil des trafics actuels et projetés à moyen terme. L’état de dégradation de la chaussée aéronautique nécessite des travaux sur l’ensemble de la piste afin de respecter les normes de l’aviation civile et de permettre une exploitation optimale de l’aéroport. Pour conduire ce projet, il est proposé de faire appel à une mission de maîtrise d’œuvre complète sous forme d’un accord cadre prévoyant les études et travaux de la piste dans un premier marché subséquent et permettant, par d’éventuels autres marchés subséquents, de réaliser les études complémentaires qui se révéleraient nécessaires à la mise aux normes et au développement de l’aéroport. (French)
    0 references
    In order to offer passengers the services of a large international airport and to adapt to changes in traffic, the airport company has embarked on a major project to expand and reconfigure its terminal. The general project is to bring existing infrastructure up to standards and adapt it to the reception of current and projected traffic in the medium term. The degradation of the aircraft pavement requires work on the entire runway in order to meet civil aviation standards and allow for optimal operation of the airport. In order to carry out this project, it is proposed to use a comprehensive project management mission in the form of a framework agreement providing for the studies and works of the runway in a first subsequent market and allowing, through possible other subsequent contracts, to carry out further studies which would prove necessary for the upgrading and development of the airport. (English)
    18 November 2021
    0 references

    Identifiers

    GP0015568
    0 references