Q3681284 (Q3681284): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes)
(‎Created claim: summary (P836): 180 collective dwellings spread over 8 collective buildings arranged parallel on the slope of the site surrounded by important green spaces. Their construction, in the form of bars and plots, was built in the early 1960s. The collective heating is provided by a boiler room and a substation. The Hot Water Sanitaire is collective for buildings D to G, and individual for A, B and C. Design Realisation Operation Maintenance (CREM): The contract comb...)
Property / summary
 
180 collective dwellings spread over 8 collective buildings arranged parallel on the slope of the site surrounded by important green spaces. Their construction, in the form of bars and plots, was built in the early 1960s. The collective heating is provided by a boiler room and a substation. The Hot Water Sanitaire is collective for buildings D to G, and individual for A, B and C. Design Realisation Operation Maintenance (CREM): The contract combines the design and operation of heating with the execution of the works in order to meet quantified energy efficiency targets. The contract signed on 28/12/2017 includes a 6-month design phase, an 18-month work phase and the operation of the collective heating and ECS installations from 01/09/2018 to 30/06/2032. (English)
Property / summary: 180 collective dwellings spread over 8 collective buildings arranged parallel on the slope of the site surrounded by important green spaces. Their construction, in the form of bars and plots, was built in the early 1960s. The collective heating is provided by a boiler room and a substation. The Hot Water Sanitaire is collective for buildings D to G, and individual for A, B and C. Design Realisation Operation Maintenance (CREM): The contract combines the design and operation of heating with the execution of the works in order to meet quantified energy efficiency targets. The contract signed on 28/12/2017 includes a 6-month design phase, an 18-month work phase and the operation of the collective heating and ECS installations from 01/09/2018 to 30/06/2032. (English) / rank
 
Normal rank
Property / summary: 180 collective dwellings spread over 8 collective buildings arranged parallel on the slope of the site surrounded by important green spaces. Their construction, in the form of bars and plots, was built in the early 1960s. The collective heating is provided by a boiler room and a substation. The Hot Water Sanitaire is collective for buildings D to G, and individual for A, B and C. Design Realisation Operation Maintenance (CREM): The contract combines the design and operation of heating with the execution of the works in order to meet quantified energy efficiency targets. The contract signed on 28/12/2017 includes a 6-month design phase, an 18-month work phase and the operation of the collective heating and ECS installations from 01/09/2018 to 30/06/2032. (English) / qualifier
 
point in time: 18 November 2021
Timestamp+2021-11-18T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 18:22, 18 November 2021

Project Q3681284 in France
Language Label Description Also known as
English
No label defined
Project Q3681284 in France

    Statements

    0 references
    1,076,404.59 Euro
    0 references
    3,588,015.29 Euro
    0 references
    30.0 percent
    0 references
    31 May 2021
    0 references
    IMMOBILIERE BASSE SEINE
    0 references

    49°29'39.59"N, 0°7'11.75"E
    0 references
    76600
    0 references
    180 logements collectifs répartis sur 8 bâtiments collectifs disposés parallèlement sur la pente du site entouré d'espaces verts importants. Leur construction, sous forme de barres et de plots, ont été édifiés au début des années 1960. Le chauffage, collectif, est assuré par une chaufferie et une sous-station. L'Eau Chaude Sanitaire est collective pour les bâtiments D à G, et individuelle pour A, B et C.La Conception Réalisation Exploitation Maintenance (CREM) : Le contrat associe la conception et l'exploitation du chauffage à la réalisation des travaux afin de remplir des objectifs chiffrés d'efficacité énergétique. Le contrat signé le 28/12/2017, comprend une phase conception de 6 mois, une phase travaux de 18 mois et l'exploitation des installations collectives de chauffage et ECS du 01/09/2018 au 30/06/2032. (French)
    0 references
    180 collective dwellings spread over 8 collective buildings arranged parallel on the slope of the site surrounded by important green spaces. Their construction, in the form of bars and plots, was built in the early 1960s. The collective heating is provided by a boiler room and a substation. The Hot Water Sanitaire is collective for buildings D to G, and individual for A, B and C. Design Realisation Operation Maintenance (CREM): The contract combines the design and operation of heating with the execution of the works in order to meet quantified energy efficiency targets. The contract signed on 28/12/2017 includes a 6-month design phase, an 18-month work phase and the operation of the collective heating and ECS installations from 01/09/2018 to 30/06/2032. (English)
    18 November 2021
    0 references

    Identifiers

    18E01877
    0 references