Q3675691 (Q3675691): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the infer coords bot - inferring coordiantes from postal codes) |
(Created claim: summary (P836): The purpose of the programming study with operational phases for the extension project of the National Performing Costume Centre is to redefine the overall implementation of the project for the extension of reserves and the creation of an interpretation centre dedicated to scenography, in a logic of operational phases while establishing the programme of the 1st work section within the building of the Military Delegation currently in the state of...) |
||||||||||||||
Property / summary | |||||||||||||||
The purpose of the programming study with operational phases for the extension project of the National Performing Costume Centre is to redefine the overall implementation of the project for the extension of reserves and the creation of an interpretation centre dedicated to scenography, in a logic of operational phases while establishing the programme of the 1st work section within the building of the Military Delegation currently in the state of wasteland. (English) | |||||||||||||||
Property / summary: The purpose of the programming study with operational phases for the extension project of the National Performing Costume Centre is to redefine the overall implementation of the project for the extension of reserves and the creation of an interpretation centre dedicated to scenography, in a logic of operational phases while establishing the programme of the 1st work section within the building of the Military Delegation currently in the state of wasteland. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The purpose of the programming study with operational phases for the extension project of the National Performing Costume Centre is to redefine the overall implementation of the project for the extension of reserves and the creation of an interpretation centre dedicated to scenography, in a logic of operational phases while establishing the programme of the 1st work section within the building of the Military Delegation currently in the state of wasteland. (English) / qualifier | |||||||||||||||
point in time: 18 November 2021
|
Revision as of 11:12, 18 November 2021
Project Q3675691 in France
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3675691 in France |
Statements
72,000.0 Euro
0 references
120,000.0 Euro
0 references
60.0 percent
0 references
1 July 2015
0 references
30 June 2019
0 references
Centre national du costume de scène
0 references
03000
0 references
L'objet de l'étude de programmation avec phasages opérationnels pour le projet d'extension du Centre national du costume de scène est de redéfinir la mise en oeuvre globale du projet d'extension des réserves et de la création d'un centre d'interprétation consacré à la scénographie, dans une logique de phasages opérationnels tout en établissant le programme de la 1ère tranche de travaux au sein du bâtiment de la Délégation militaire actuellement à l'état de friche. (French)
0 references
The purpose of the programming study with operational phases for the extension project of the National Performing Costume Centre is to redefine the overall implementation of the project for the extension of reserves and the creation of an interpretation centre dedicated to scenography, in a logic of operational phases while establishing the programme of the 1st work section within the building of the Military Delegation currently in the state of wasteland. (English)
18 November 2021
0 references
Identifiers
AV0010301
0 references