Q3700723 (Q3700723): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Created claim: summary (P836): The operation constitutes the third tranche to strengthen the waste water transfer chain to the Babobab STEP. It consists mainly of the construction of three discharge stations (PRs) and a storage basin at the entrance to the sewage treatment plant. It contains a conditional tranche did not cover the framework of this aid application, namely: optimisation at the MJC PR and redesign of the collection and transfer architecture to the roundabout of...)
Property / summary
 
The operation constitutes the third tranche to strengthen the waste water transfer chain to the Babobab STEP. It consists mainly of the construction of three discharge stations (PRs) and a storage basin at the entrance to the sewage treatment plant. It contains a conditional tranche did not cover the framework of this aid application, namely: optimisation at the MJC PR and redesign of the collection and transfer architecture to the roundabout of the Baobab. (English)
Property / summary: The operation constitutes the third tranche to strengthen the waste water transfer chain to the Babobab STEP. It consists mainly of the construction of three discharge stations (PRs) and a storage basin at the entrance to the sewage treatment plant. It contains a conditional tranche did not cover the framework of this aid application, namely: optimisation at the MJC PR and redesign of the collection and transfer architecture to the roundabout of the Baobab. (English) / rank
 
Normal rank
Property / summary: The operation constitutes the third tranche to strengthen the waste water transfer chain to the Babobab STEP. It consists mainly of the construction of three discharge stations (PRs) and a storage basin at the entrance to the sewage treatment plant. It contains a conditional tranche did not cover the framework of this aid application, namely: optimisation at the MJC PR and redesign of the collection and transfer architecture to the roundabout of the Baobab. (English) / qualifier
 
point in time: 22 November 2021
Timestamp+2021-11-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:54, 22 November 2021

Project Q3700723 in France
Language Label Description Also known as
English
No label defined
Project Q3700723 in France

    Statements

    0 references
    1,190,000.0 Euro
    0 references
    7,000,000.0 Euro
    0 references
    17.0 percent
    0 references
    1 March 2016
    0 references
    31 August 2019
    0 references
    Syndicat Intercommunal d'Eau et d'Assainissement de Mayotte (SIEAM)
    0 references
    L'opération constitue la troisième tranche portant renforcement de la chaine de transfert des eaux usées vers la STEP du Babobab. Elle consiste principalement à la réalisation de trois postes de refoulement (PR) et un bassin de stockage à l'entrée de la station d'épuration. Elle contient une tranche conditionnelle n'ont prise en charge de le cadre de cette présente demande d'aide à savoir: l'optimisation au niveau du PR MJC et refonte de l’architecture de collecte et de transfert jusqu'au rond point du Baobab. (French)
    0 references
    The operation constitutes the third tranche to strengthen the waste water transfer chain to the Babobab STEP. It consists mainly of the construction of three discharge stations (PRs) and a storage basin at the entrance to the sewage treatment plant. It contains a conditional tranche did not cover the framework of this aid application, namely: optimisation at the MJC PR and redesign of the collection and transfer architecture to the roundabout of the Baobab. (English)
    22 November 2021
    0 references

    Identifiers

    PY0002048
    0 references