Q3698744 (Q3698744): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Created claim: summary (P836): Construction of a collective agricultural methanisation unit, with biomethane injected into the TSO network. The objectives are multiple: —Produce 21 000 MWh of biomethane from the 31.800 t of treated substrate, making it possible to sustain the operation by diversifying the sources of revenue. —Value the digestate and save mineral fertiliser. —Creating jobs on the structure and local jobs, translated_summary)
Property / summary
 
Construction of a collective agricultural methanisation unit, with biomethane injected into the TSO network. The objectives are multiple: —Produce 21 000 MWh of biomethane from the 31.800 t of treated substrate, making it possible to sustain the operation by diversifying the sources of revenue. —Value the digestate and save mineral fertiliser. —Creating jobs on the structure and local jobs (English)
Property / summary: Construction of a collective agricultural methanisation unit, with biomethane injected into the TSO network. The objectives are multiple: —Produce 21 000 MWh of biomethane from the 31.800 t of treated substrate, making it possible to sustain the operation by diversifying the sources of revenue. —Value the digestate and save mineral fertiliser. —Creating jobs on the structure and local jobs (English) / rank
 
Normal rank
Property / summary: Construction of a collective agricultural methanisation unit, with biomethane injected into the TSO network. The objectives are multiple: —Produce 21 000 MWh of biomethane from the 31.800 t of treated substrate, making it possible to sustain the operation by diversifying the sources of revenue. —Value the digestate and save mineral fertiliser. —Creating jobs on the structure and local jobs (English) / qualifier
 
point in time: 22 November 2021
Timestamp+2021-11-22T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 11:29, 22 November 2021

Project Q3698744 in France
Language Label Description Also known as
English
No label defined
Project Q3698744 in France

    Statements

    0 references
    932,973.0 Euro
    0 references
    7,940,200.39 Euro
    0 references
    11.75 percent
    0 references
    1 October 2018
    0 references
    30 December 2021
    0 references
    SAS Augigaz
    0 references
    Construction d’une unité de méthanisation agricole collective, avec injection du biométhane sur le réseau GRT. Les objectifs sont multiples : -Produire 21 000 MWh de biométhane à partir des 31 800 t de substrat traités, permettant de pérenniser l’exploitation en diversifiant les sources de revenus. -Valoriser le digestat et économiser de l’engrais minéral. -Créer des emplois sur la structure et des emplois locaux (French)
    0 references
    Construction of a collective agricultural methanisation unit, with biomethane injected into the TSO network. The objectives are multiple: —Produce 21 000 MWh of biomethane from the 31.800 t of treated substrate, making it possible to sustain the operation by diversifying the sources of revenue. —Value the digestate and save mineral fertiliser. —Creating jobs on the structure and local jobs (English)
    22 November 2021
    0 references

    Identifiers

    FC0018914
    0 references