Q3688511 (Q3688511): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: importing one item from France)
(‎Created claim: summary (P836): The city of Tourcoing is currently carrying out a major requalification project for its city centre, the Quadrilatère des Piscines. The SEM Renewed City developer submits a grant application for a first phase of the programme, i.e. the implementation on the school group of a biotope coefficient of 0.5, allowing to limit soil mineralisation and thus to introduce more nature in the city. The project of the school group consists of the constructi...)
Property / summary
 
The city of Tourcoing is currently carrying out a major requalification project for its city centre, the Quadrilatère des Piscines. The SEM Renewed City developer submits a grant application for a first phase of the programme, i.e. the implementation on the school group of a biotope coefficient of 0.5, allowing to limit soil mineralisation and thus to introduce more nature in the city. The project of the school group consists of the construction of a building on 3 levels (building in R+ 2) integrating biodiversity. All roofs (1 760 m²) are planted. The target species targeted by these developments are the elegant chardonneret, the black martinet and the kingtelet. On this operation, the monitoring of biodiversity will be carried out at three levels, by the City’s agents, through a partnership with the MEL and in partnership with associations like GON, on the avifaune. The nature of the operations to be carried out under this development programme meets the objectives of priority axis 3, Priority investment OT 4 and its investment priority 4th, specific objective 3, which aims to increase nature in the city and to demonstrate through some experimental operations the possibility of a change of low-carbon urban model adapting to the new climate context and responding to the challenges of the energy transition. The total area managed by this operation is estimated at 2 194.85 m². (English)
Property / summary: The city of Tourcoing is currently carrying out a major requalification project for its city centre, the Quadrilatère des Piscines. The SEM Renewed City developer submits a grant application for a first phase of the programme, i.e. the implementation on the school group of a biotope coefficient of 0.5, allowing to limit soil mineralisation and thus to introduce more nature in the city. The project of the school group consists of the construction of a building on 3 levels (building in R+ 2) integrating biodiversity. All roofs (1 760 m²) are planted. The target species targeted by these developments are the elegant chardonneret, the black martinet and the kingtelet. On this operation, the monitoring of biodiversity will be carried out at three levels, by the City’s agents, through a partnership with the MEL and in partnership with associations like GON, on the avifaune. The nature of the operations to be carried out under this development programme meets the objectives of priority axis 3, Priority investment OT 4 and its investment priority 4th, specific objective 3, which aims to increase nature in the city and to demonstrate through some experimental operations the possibility of a change of low-carbon urban model adapting to the new climate context and responding to the challenges of the energy transition. The total area managed by this operation is estimated at 2 194.85 m². (English) / rank
 
Normal rank
Property / summary: The city of Tourcoing is currently carrying out a major requalification project for its city centre, the Quadrilatère des Piscines. The SEM Renewed City developer submits a grant application for a first phase of the programme, i.e. the implementation on the school group of a biotope coefficient of 0.5, allowing to limit soil mineralisation and thus to introduce more nature in the city. The project of the school group consists of the construction of a building on 3 levels (building in R+ 2) integrating biodiversity. All roofs (1 760 m²) are planted. The target species targeted by these developments are the elegant chardonneret, the black martinet and the kingtelet. On this operation, the monitoring of biodiversity will be carried out at three levels, by the City’s agents, through a partnership with the MEL and in partnership with associations like GON, on the avifaune. The nature of the operations to be carried out under this development programme meets the objectives of priority axis 3, Priority investment OT 4 and its investment priority 4th, specific objective 3, which aims to increase nature in the city and to demonstrate through some experimental operations the possibility of a change of low-carbon urban model adapting to the new climate context and responding to the challenges of the energy transition. The total area managed by this operation is estimated at 2 194.85 m². (English) / qualifier
 
point in time: 18 November 2021
Timestamp+2021-11-18T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 18:46, 18 November 2021

Project Q3688511 in France
Language Label Description Also known as
English
No label defined
Project Q3688511 in France

    Statements

    0 references
    89,928.0 Euro
    0 references
    149,880.2 Euro
    0 references
    60.0 percent
    0 references
    1 May 2018
    0 references
    31 July 2019
    0 references
    SEM VILLE RENOUVELEE
    0 references
    La ville de Tourcoing mène actuellement un projet d’envergure de requalification de son centre-ville, le Quadrilatère des Piscines. L'aménageur SEM Ville Renouvelée présente une demande de subvention sur une première phase du programme, à savoir la mise en œuvre sur le groupe scolaire d'un coefficient de biotope de 0,5, permettant de limiter la minéralisation des sols et donc d’introduire plus de nature en ville . Le projet du groupe scolaire consiste dans la réalisation d’un bâtiment sur 3 niveaux (bâtiment en R+2) intégrant la biodiversité. Toutes les toitures (1 760 m2) sont végétalisées. Les espèces-cibles visées par ces aménagements sont le chardonneret élégant, le martinet noir et le roitelet huppé. Sur cette opération, le suivi de la biodiversité se fera à trois niveaux, par les agents de la Ville, au travers d’un partenariat avec la MEL et en partenariat avec des associations type GON, sur l’avifaune. La nature des opérations qui seront réalisées dans le cadre de ce programme d’aménagement répond aux objectifs de l’axe prioritaire 3, Investissement prioritaire OT 4 et sa priorité d’investissement 4e, objectif spécifique 3 qui vise à accroître la nature en ville et à démontrer à travers quelques opérations expérimentales la possibilité d'un changement de modèle urbain de type bas carbone s'adaptant au nouveau contexte climatique et répondant aux enjeux de la transition énergétique. La superficie totale aménagée par cette opération est estimée à 2 194,85 m2. (French)
    0 references
    The city of Tourcoing is currently carrying out a major requalification project for its city centre, the Quadrilatère des Piscines. The SEM Renewed City developer submits a grant application for a first phase of the programme, i.e. the implementation on the school group of a biotope coefficient of 0.5, allowing to limit soil mineralisation and thus to introduce more nature in the city. The project of the school group consists of the construction of a building on 3 levels (building in R+ 2) integrating biodiversity. All roofs (1 760 m²) are planted. The target species targeted by these developments are the elegant chardonneret, the black martinet and the kingtelet. On this operation, the monitoring of biodiversity will be carried out at three levels, by the City’s agents, through a partnership with the MEL and in partnership with associations like GON, on the avifaune. The nature of the operations to be carried out under this development programme meets the objectives of priority axis 3, Priority investment OT 4 and its investment priority 4th, specific objective 3, which aims to increase nature in the city and to demonstrate through some experimental operations the possibility of a change of low-carbon urban model adapting to the new climate context and responding to the challenges of the energy transition. The total area managed by this operation is estimated at 2 194.85 m². (English)
    18 November 2021
    0 references

    Identifiers

    NP0018573
    0 references