Q3668873 (Q3668873): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: Setting new description)
(‎Created claim: summary (P836): As part of its marine flood risk management policy, the City has chosen to prioritise its intervention on the Jonsthon dike. Objective 1: reduce population vulnerability by reducing the risk of marine submersion.Objective 2: preserve the sensitive natural space of the West Salted Meadows.Objective 3: guarantee the maintenance of the pedestrian path, at the head of the dike.In order to meet this, the dike will be reinforced by a foot stop in sta...)
Property / summary
 
As part of its marine flood risk management policy, the City has chosen to prioritise its intervention on the Jonsthon dike. Objective 1: reduce population vulnerability by reducing the risk of marine submersion.Objective 2: preserve the sensitive natural space of the West Salted Meadows.Objective 3: guarantee the maintenance of the pedestrian path, at the head of the dike.In order to meet this, the dike will be reinforced by a foot stop in stalks side of Arcachon basin and a co-linked rock slope. At the head of the building, a pedestrian path will be reconstituted. The West Pres Salés side slope will be covered with a three-dimensional geo-grid allowing it to withstand the overflow. (English)
Property / summary: As part of its marine flood risk management policy, the City has chosen to prioritise its intervention on the Jonsthon dike. Objective 1: reduce population vulnerability by reducing the risk of marine submersion.Objective 2: preserve the sensitive natural space of the West Salted Meadows.Objective 3: guarantee the maintenance of the pedestrian path, at the head of the dike.In order to meet this, the dike will be reinforced by a foot stop in stalks side of Arcachon basin and a co-linked rock slope. At the head of the building, a pedestrian path will be reconstituted. The West Pres Salés side slope will be covered with a three-dimensional geo-grid allowing it to withstand the overflow. (English) / rank
 
Normal rank
Property / summary: As part of its marine flood risk management policy, the City has chosen to prioritise its intervention on the Jonsthon dike. Objective 1: reduce population vulnerability by reducing the risk of marine submersion.Objective 2: preserve the sensitive natural space of the West Salted Meadows.Objective 3: guarantee the maintenance of the pedestrian path, at the head of the dike.In order to meet this, the dike will be reinforced by a foot stop in stalks side of Arcachon basin and a co-linked rock slope. At the head of the building, a pedestrian path will be reconstituted. The West Pres Salés side slope will be covered with a three-dimensional geo-grid allowing it to withstand the overflow. (English) / qualifier
 
point in time: 18 November 2021
Timestamp+2021-11-18T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 10:29, 18 November 2021

Project Q3668873 in France
Language Label Description Also known as
English
No label defined
Project Q3668873 in France

    Statements

    0 references
    329,331.00 Euro
    0 references
    778,325.0 Euro
    0 references
    42.31 percent
    0 references
    12 November 2015
    0 references
    2 September 2017
    0 references
    COMMUNE DE LA TESTE DE BUCH
    0 references
    Dans le cadre de sa politique de gestion des risques d'inondation par submersion marine, la Ville a choisi de prioriser son intervention sur la digue Jonsthon. Objectif 1 : réduire de la vulnérabilité des populations en réduisant le risque de submersion marine.Objectif 2 : préserver l'espace naturel sensible des Prés Salés Ouest.Objectif 3 : garantir le maintien du cheminement piéton, en tête de digue.Pour y répondre, la digue sera confortée par une butée de pied en palplanches côté bassin d'Arcachon et un talus en enrochements liaisonnés. En tête d'ouvrage sera reconstitué un cheminement piéton. Le talus coté Prés Salés Ouest sera recouvert d'une géo grille tridimensionnelle lui permettant de résister à la surverse. (French)
    0 references
    As part of its marine flood risk management policy, the City has chosen to prioritise its intervention on the Jonsthon dike. Objective 1: reduce population vulnerability by reducing the risk of marine submersion.Objective 2: preserve the sensitive natural space of the West Salted Meadows.Objective 3: guarantee the maintenance of the pedestrian path, at the head of the dike.In order to meet this, the dike will be reinforced by a foot stop in stalks side of Arcachon basin and a co-linked rock slope. At the head of the building, a pedestrian path will be reconstituted. The West Pres Salés side slope will be covered with a three-dimensional geo-grid allowing it to withstand the overflow. (English)
    18 November 2021
    0 references
    Rue Edmond Doré, 33260 La Teste-de-Buch, France
    0 references

    Identifiers

    3290810
    0 references