LPW-E/2.2.1/8 — Adolf Nissen Elektrobau GmbH & Co. KG — Grundl. Change of the entire production process at a plant in Tönning (Q3333144): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the materialized bot - inferring region from the coordinates) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
LPW-E — Adolf Nissen Elektrobau GmbH & Co. KG — Grundl. Modification de l’ensemble du processus de production dans un établissement de Tönning | |||||||||||||||
Property / summary | |||||||||||||||
Nissen KG a l’intention de cultiver le site existant. Le département technique et technique peut ainsi être externalisé, ce qui permet d’améliorer les processus de production et d’accepter ainsi des commandes plus importantes. (French) | |||||||||||||||
Property / summary: Nissen KG a l’intention de cultiver le site existant. Le département technique et technique peut ainsi être externalisé, ce qui permet d’améliorer les processus de production et d’accepter ainsi des commandes plus importantes. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Nissen KG a l’intention de cultiver le site existant. Le département technique et technique peut ainsi être externalisé, ce qui permet d’améliorer les processus de production et d’accepter ainsi des commandes plus importantes. (French) / qualifier | |||||||||||||||
point in time: 7 December 2021
|
Revision as of 07:57, 7 December 2021
Project Q3333144 in Germany
Language | Label | Description | Also known as |
---|---|---|---|
English | LPW-E/2.2.1/8 — Adolf Nissen Elektrobau GmbH & Co. KG — Grundl. Change of the entire production process at a plant in Tönning |
Project Q3333144 in Germany |
Statements
2,436,139.55 Euro
0 references
Adolf Nissen Elektrobau GmbH + Co. KG
0 references
25832 Tönning
0 references
Die Nissen KG beabsichtigt einen Anbau an die bestehende Betriebsstätte. Kfm. u. techn. Abteilung können dadurch ausgelagert werden, so dass verbesserte Produktionsabläufe ermöglicht werden und dadurch größere Aufträge angenommen werden können. (German)
0 references
Nissen KG intends to grow to the existing establishment. As a result, Kfm. u. techn. department can be outsourced so that improved production processes can be made possible and thus larger orders can be accepted. (English)
25 October 2021
0 references
Nissen KG a l’intention de cultiver le site existant. Le département technique et technique peut ainsi être externalisé, ce qui permet d’améliorer les processus de production et d’accepter ainsi des commandes plus importantes. (French)
7 December 2021
0 references
Identifiers
DE_TEMPORARY_35789
0 references