Intervention in the Terrestrial Logistic Circuits of the Third? Rehabilitation and Benefit of the Sections of the Circular of Angra do Heroísmo and the Ramal of E.R. 1-1.ª access to the Port of Cinco Ribeiras (Q2854035): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Intervention dans les troisièmes circuits logistiques terrestres? Réhabilitation et bienveillance des sections de la Circulaire d’Angra do Heroísmo et du Ramal de l’E.R. 1-1er accès au Port des Cinq Ribeiras
Property / summary
 
Le projet comprend les éléments de construction et de révision des prix de la construction du contrat d’intervention dans les circuits logistiques terrestres de Terceira — Réhabilitation et bien-être des sections de la circulaire d’Angra do Heroísmo et du Ramal da E.R. no 1-1 accès au port des Cinq Ribeiras, ce qui se traduit par la réhabilitation du plancher routier, en fraisant le trottoir existant en bitumineux, régularisation et repositionnement de la (French)
Property / summary: Le projet comprend les éléments de construction et de révision des prix de la construction du contrat d’intervention dans les circuits logistiques terrestres de Terceira — Réhabilitation et bien-être des sections de la circulaire d’Angra do Heroísmo et du Ramal da E.R. no 1-1 accès au port des Cinq Ribeiras, ce qui se traduit par la réhabilitation du plancher routier, en fraisant le trottoir existant en bitumineux, régularisation et repositionnement de la (French) / rank
 
Normal rank
Property / summary: Le projet comprend les éléments de construction et de révision des prix de la construction du contrat d’intervention dans les circuits logistiques terrestres de Terceira — Réhabilitation et bien-être des sections de la circulaire d’Angra do Heroísmo et du Ramal da E.R. no 1-1 accès au port des Cinq Ribeiras, ce qui se traduit par la réhabilitation du plancher routier, en fraisant le trottoir existant en bitumineux, régularisation et repositionnement de la (French) / qualifier
 
point in time: 4 December 2021
Timestamp+2021-12-04T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 15:32, 4 December 2021

Project Q2854035 in Portugal
Language Label Description Also known as
English
Intervention in the Terrestrial Logistic Circuits of the Third? Rehabilitation and Benefit of the Sections of the Circular of Angra do Heroísmo and the Ramal of E.R. 1-1.ª access to the Port of Cinco Ribeiras
Project Q2854035 in Portugal

    Statements

    0 references
    0 references
    554,849.0 Euro
    0 references
    652,764.0 Euro
    0 references
    85.0 percent
    0 references
    31 March 2017
    0 references
    14 May 2018
    0 references
    SECRETARIA REGIONAL DAS OBRAS PÚBLICAS E COMUNICAÇÕES
    0 references
    0 references

    38°39'33.55"N, 27°13'10.42"W
    0 references
    O projeto contempla as componentes de construção e de revisão de preços da construção da empreitada de Intervenção nos Circuitos Logísticos Terrestres da Terceira - Reabilitação e Beneficiação dos troços da Circular de Angra do Heroísmo e do Ramal da E. R. N.º 1-1.ª de acesso ao Porto das Cinco Ribeiras, que se traduz na reabilitação do pavimento das vias, mediante a fresagem do pavimento existente em betuminoso, regularização e reperfilamento da (Portuguese)
    0 references
    The project includes the components of construction and price revision of the construction of the Intervention contract in Terrestrial Logistic Circuits of Terceira – Rehabilitation and Benefit of the sections of the Circular of Angra do Heroísmo and the Branch of E. R. No. 1-1ª of access to the Port of Cinco Ribeiras, which translates into the rehabilitation of the road pavement, by milling the existing pavement in bituminous, regularisation and refilling of the roads (English)
    6 July 2021
    0 references
    Le projet comprend les éléments de construction et de révision des prix de la construction du contrat d’intervention dans les circuits logistiques terrestres de Terceira — Réhabilitation et bien-être des sections de la circulaire d’Angra do Heroísmo et du Ramal da E.R. no 1-1 accès au port des Cinq Ribeiras, ce qui se traduit par la réhabilitation du plancher routier, en fraisant le trottoir existant en bitumineux, régularisation et repositionnement de la (French)
    4 December 2021
    0 references
    Angra do Heroísmo
    0 references

    Identifiers

    ACORES-07-2756-FEDER-000015
    0 references