Operating aid to overcome the permanent and structural difficulties faced by firms in the region (Q2887702): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Aides au fonctionnement pour faire face aux difficultés permanentes et structurelles des entreprises de la région
Property / summary
 
ce projet présente un ensemble de coûts d’exploitation, à savoir les CONTRIBUTIONS OBRIGATIVES SALAIRES DES COSTES POUR LA SÉCURITÉ SOCIALE, les RENDS D’INSTALLATION, les COSTES AVEC LA CONSUMPTION ÉLECTRIQUE ÉNERGIE et L’EAU, conformément à l’article 14, paragraphe 1, points b) i) à v), respectivement, de l’arrêté ministériel d’exécution no 374/2019 du 8 juillet 2019. (French)
Property / summary: ce projet présente un ensemble de coûts d’exploitation, à savoir les CONTRIBUTIONS OBRIGATIVES SALAIRES DES COSTES POUR LA SÉCURITÉ SOCIALE, les RENDS D’INSTALLATION, les COSTES AVEC LA CONSUMPTION ÉLECTRIQUE ÉNERGIE et L’EAU, conformément à l’article 14, paragraphe 1, points b) i) à v), respectivement, de l’arrêté ministériel d’exécution no 374/2019 du 8 juillet 2019. (French) / rank
 
Normal rank
Property / summary: ce projet présente un ensemble de coûts d’exploitation, à savoir les CONTRIBUTIONS OBRIGATIVES SALAIRES DES COSTES POUR LA SÉCURITÉ SOCIALE, les RENDS D’INSTALLATION, les COSTES AVEC LA CONSUMPTION ÉLECTRIQUE ÉNERGIE et L’EAU, conformément à l’article 14, paragraphe 1, points b) i) à v), respectivement, de l’arrêté ministériel d’exécution no 374/2019 du 8 juillet 2019. (French) / qualifier
 
point in time: 5 December 2021
Timestamp+2021-12-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 08:38, 5 December 2021

Project Q2887702 in Portugal
Language Label Description Also known as
English
Operating aid to overcome the permanent and structural difficulties faced by firms in the region
Project Q2887702 in Portugal

    Statements

    0 references
    0 references
    17,000.0 Euro
    0 references
    308,252.0 Euro
    0 references
    5.51 percent
    0 references
    1 January 2018
    0 references
    28 February 2019
    0 references
    SABOR & COMPANHIA, LDA
    0 references
    0 references

    32°43'17.04"N, 17°5'6.29"W
    0 references
    ste projeto apresentar um conjunto de despesas de funcionamento, nomeadamente, CUSTOS SALARIAIS CONTRIBUIÇÕES OBRIGATÓRIAS PARA A SEGURANÇA SOCIAL, RENDAS DAS INSTALAÇÕES, CUSTOS COM O CONSUMO DE ENERGIA ELÉTRICA e ÁGUA, conforme previsto nas subalíneas i), a v), respetivamente, da alínea b) do n.º 1 do artigo 14.º da Portaria n.º 374/2019, de 8 de julho.O projeto permite a manutenção dos 19 p (Portuguese)
    0 references
    this project presents a set of operating costs, in particular SALARIAL COSTS CONTRIBUTIONS OBRIBUTIONS FOR SOCIAL SECURITY, RENDAS FOR INSTALLATIONS, CUSTS WITH THE CONSUMPTION OF ELETRIC ENERGY and WATER, as provided for in points (i) to (v), respectively, of Article 14(b) of Article 19(1) of Regulation (EC) No. 19 of Article 19 of Regulation (EEC) No. (English)
    8 July 2021
    0 references
    ce projet présente un ensemble de coûts d’exploitation, à savoir les CONTRIBUTIONS OBRIGATIVES SALAIRES DES COSTES POUR LA SÉCURITÉ SOCIALE, les RENDS D’INSTALLATION, les COSTES AVEC LA CONSUMPTION ÉLECTRIQUE ÉNERGIE et L’EAU, conformément à l’article 14, paragraphe 1, points b) i) à v), respectivement, de l’arrêté ministériel d’exécution no 374/2019 du 8 juillet 2019. (French)
    5 December 2021
    0 references
    Ponta do Sol, Ponta do Sol
    0 references

    Identifiers

    M1420-11-6076-FEDER-004416
    0 references