ADDUCTOR DUCTS – ADOBISPO AND BEBESES (Q2982958): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: budget (P474): 139,764.44 euro) |
(Changed an Item: modifying budgets in portugal one item from slovenia) |
||||||
Property / budget | |||||||
164,429.0 Euro
| |||||||
Property / budget: 164,429.0 Euro / rank | |||||||
Normal rank | |||||||
Property / EU contribution | |||||||
139,764.0 Euro
| |||||||
Property / EU contribution: 139,764.0 Euro / rank | |||||||
Normal rank | |||||||
Property / co-financing rate | |||||||
85.0 percent
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Normal rank |
Revision as of 04:31, 22 October 2021
Project Q2982958 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | ADDUCTOR DUCTS – ADOBISPO AND BEBESES |
Project Q2982958 in Portugal |
Statements
139,764.0 Euro
0 references
164,429.0 Euro
0 references
85.0 percent
0 references
1 September 2021
0 references
30 September 2022
0 references
MUNICÍPIO DE PENEDONO
0 references
A operação prevê a correção do parâmetro arsénio que se verifica ao nível da Rede Pública de Abastecimento de Água nos lugares de Adobispo e de Bebeses através da execução de condutas adutoras de ligação entre os reservatórios de Ferronha Adobispo e dos reservatórios de Póvoa de Penela Bebeses, de forma a promover o AA proveniente de captações que cumprem com o parâmetro arsénio. (Portuguese)
0 references
The operation provides for the correction of the arsenic parameter that occurs at the level of the Public Water Supply Network in Adobispus and Bebeses places through the execution of pipelines connecting the reservoirs of Ferronha Adobispo and the Póvoa de Penela Bebeses reservoirs, in order to promote the AA from captures that comply with the arsenic parameter. (English)
9 July 2021
0 references
Penedono
0 references
Identifiers
POSEUR-03-2012-FC-001457
0 references