Requalification of the Sand Basic School (Q2899262): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Requalification de l’École de base des sables
Property / summary
 
—Il s’agit de l’amélioration et de l’expansion de l’École de base des sables (1er cycle). Une cafétéria sera construite et remise en état du bâtiment existant au niveau des cadres, de l’isolation thermique, des installations sanitaires et de la peinture. (French)
Property / summary: —Il s’agit de l’amélioration et de l’expansion de l’École de base des sables (1er cycle). Une cafétéria sera construite et remise en état du bâtiment existant au niveau des cadres, de l’isolation thermique, des installations sanitaires et de la peinture. (French) / rank
 
Normal rank
Property / summary: —Il s’agit de l’amélioration et de l’expansion de l’École de base des sables (1er cycle). Une cafétéria sera construite et remise en état du bâtiment existant au niveau des cadres, de l’isolation thermique, des installations sanitaires et de la peinture. (French) / qualifier
 
point in time: 5 December 2021
Timestamp+2021-12-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 18:01, 5 December 2021

Project Q2899262 in Portugal
Language Label Description Also known as
English
Requalification of the Sand Basic School
Project Q2899262 in Portugal

    Statements

    0 references
    170,000.0 Euro
    0 references
    200,000.0 Euro
    0 references
    85.0 percent
    0 references
    15 January 2018
    0 references
    28 December 2018
    0 references
    MUNICÍPIO DE VALE DE CAMBRA
    0 references

    40°49'55.70"N, 8°23'32.64"W
    0 references
    -Trata-se da beneficiação e ampliação da Escola Básica de Areias (1º ciclo). Será construído um refeitório e efetuada a remodelação do edifício existente ao nível das caixilharias, isolamento térmico, instalações sanitárias e pintura. (Portuguese)
    0 references
    —This is the improvement and expansion of the Basic School of Areias (1st cycle). A cafeteria will be built and the existing building is refurbished at the level of the frames, thermal insulation, sanitary facilities and painting. (English)
    8 July 2021
    0 references
    —Il s’agit de l’amélioration et de l’expansion de l’École de base des sables (1er cycle). Une cafétéria sera construite et remise en état du bâtiment existant au niveau des cadres, de l’isolation thermique, des installations sanitaires et de la peinture. (French)
    5 December 2021
    0 references
    Vale de Cambra, São Pedro de Castelões
    0 references

    Identifiers

    NORTE-08-5673-FEDER-000059
    0 references