Works at the Water Treatment Station of S João do Peso (Q2982579): Difference between revisions
Jump to navigation
Jump to search
(Removed claim: budget (P474): 212,997.65 euro) |
(Changed an Item: modifying budgets in portugal one item from slovenia) |
||||||
Property / budget | |||||||
250,585.0 Euro
| |||||||
Property / budget: 250,585.0 Euro / rank | |||||||
Normal rank | |||||||
Property / EU contribution | |||||||
212,998.0 Euro
| |||||||
Property / EU contribution: 212,998.0 Euro / rank | |||||||
Normal rank | |||||||
Property / co-financing rate | |||||||
85.0 percent
| |||||||
Property / co-financing rate: 85.0 percent / rank | |||||||
Normal rank |
Revision as of 19:19, 21 October 2021
Project Q2982579 in Portugal
Language | Label | Description | Also known as |
---|---|---|---|
English | Works at the Water Treatment Station of S João do Peso |
Project Q2982579 in Portugal |
Statements
212,998.0 Euro
0 references
250,585.0 Euro
0 references
85.0 percent
0 references
1 March 2018
0 references
29 May 2020
0 references
MUNICÍPIO DE VILA DE REI
0 references
Q2991038 (Deleted Item)
0 references
Esta operação surge no sentido de dar resposta à necessidade detetada de reformulação dos equipamentos existentes, consistindo na substituição de duas unidades existentes por apenas uma ETAR, visando reduzir os custos que lhes estão associados, maximizar os recursos disponibilizados e cumprir os parâmetros de descarga, a fim de concorrer para a diminuição da poluição das massas de água. (Portuguese)
0 references
This operation is designed to meet the detected need for recasting of existing equipment, consisting of the replacement of two existing plants with only one sewage plant, with a view to reducing the associated costs, maximising the resources available and complying with the discharge parameters in order to contribute to the reduction of pollution of water bodies. (English)
9 July 2021
0 references
Vila de Rei, São João do Peso
0 references
Identifiers
POSEUR-03-2012-FC-000829
0 references