Installation of a biomass boiler in the Impulso Verde building (Q3235203): Difference between revisions
Jump to navigation
Jump to search
(Removed claims) |
(Changed an Item) |
||||||
Property / budget | |||||||
10,324.93 Euro
| |||||||
Property / budget: 10,324.93 Euro / rank | |||||||
Normal rank | |||||||
Property / co-financing rate | |||||||
80.0 percent
| |||||||
Property / co-financing rate: 80.0 percent / rank | |||||||
Normal rank | |||||||
Property / EU contribution | |||||||
8,259.94 Euro
| |||||||
Property / EU contribution: 8,259.94 Euro / rank | |||||||
Normal rank |
Revision as of 15:57, 21 October 2021
Project Q3235203 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of a biomass boiler in the Impulso Verde building |
Project Q3235203 in Spain |
Statements
8,259.94 Euro
0 references
10,324.93 Euro
0 references
80.0 percent
0 references
3 August 2020
0 references
15 June 2021
0 references
AYUNTAMIENTO DE LUGO
0 references
27028
0 references
Instalación de una caldera de biomasa de pellets, de 25 kW de potencia nominal, destinada a calefactar una superficie total de 677 metros cuadrados. La instalación incorpora un silo flexible, de 3.300 litros de capacidad, e intercambiador con sistema de limpieza automática. (Spanish)
0 references
Installation of a pellet biomass boiler, with a nominal power of 25 kW, designed to heat a total area of 677 square meters. The installation incorporates a flexible silo, with a 3.300-liter capacity, and an exchanger with an automatic cleaning system. (English)
0 references
Lugo
0 references
Identifiers
048-2020000206
0 references