Basic School 1 de Oliveira do Hospital – Coverage (Q2871096): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
1 de Oliveira do Hôpital École de base — Couverture
Property / summary
 
Cette opération comprend le remplacement des toitures de l’hôpital Escola Básica 1 de Oliveira do, afin d’enlever tous les éléments préfabriqués constitués de ciment d’amiante qui les constituent, essentiellement au niveau de:Remoção de tous les éléments préfabriqués constitués de ciment d’amiante des toitures et de remplacement par des feuilles naturantes Remplacement du couvercle des passerelles. (French)
Property / summary: Cette opération comprend le remplacement des toitures de l’hôpital Escola Básica 1 de Oliveira do, afin d’enlever tous les éléments préfabriqués constitués de ciment d’amiante qui les constituent, essentiellement au niveau de:Remoção de tous les éléments préfabriqués constitués de ciment d’amiante des toitures et de remplacement par des feuilles naturantes Remplacement du couvercle des passerelles. (French) / rank
 
Normal rank
Property / summary: Cette opération comprend le remplacement des toitures de l’hôpital Escola Básica 1 de Oliveira do, afin d’enlever tous les éléments préfabriqués constitués de ciment d’amiante qui les constituent, essentiellement au niveau de:Remoção de tous les éléments préfabriqués constitués de ciment d’amiante des toitures et de remplacement par des feuilles naturantes Remplacement du couvercle des passerelles. (French) / qualifier
 
point in time: 4 December 2021
Timestamp+2021-12-04T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 22:16, 4 December 2021

Project Q2871096 in Portugal
Language Label Description Also known as
English
Basic School 1 de Oliveira do Hospital – Coverage
Project Q2871096 in Portugal

    Statements

    0 references
    45,474.0 Euro
    0 references
    45,474.0 Euro
    0 references
    100.0 percent
    0 references
    1 April 2021
    0 references
    31 August 2021
    0 references
    MUNICÍPIO DE OLIVEIRA DO HOSPITAL
    0 references
    Q2990929 (Deleted Item)
    0 references

    40°21'34.34"N, 7°51'42.30"W
    0 references
    Esta operação contempla a substituição das coberturas da Escola Básica 1 de Oliveira do Hospital, com a finalidade de remover todos os elementos pré-fabricados constituídos por fibrocimento que as constituem, essencialmente ao nível de:•Remoção de todos os elementos pré-fabricados constituídos por fibrocimento com amianto das coberturas e substituição por chapas de naturocimento •Substituição da cobertura dos passadiços. (Portuguese)
    0 references
    This operation includes the replacement of the coverings of Escola Básica 1 de Oliveira do Hospital, in order to remove all prefabricated elements consisting of asbestos cement that constitute them, essentially at the level of:Removal of all prefabricated elements consisting of fibrocement with asbestos from the roofs and replacement by naturocement plates Replacement of the cover of the walkways. (English)
    7 July 2021
    0 references
    Cette opération comprend le remplacement des toitures de l’hôpital Escola Básica 1 de Oliveira do, afin d’enlever tous les éléments préfabriqués constitués de ciment d’amiante qui les constituent, essentiellement au niveau de:Remoção de tous les éléments préfabriqués constitués de ciment d’amiante des toitures et de remplacement par des feuilles naturantes Remplacement du couvercle des passerelles. (French)
    4 December 2021
    0 references
    Oliveira do Hospital, União das freguesias de Oliveira do Hospital e São Paio de Gramaços
    0 references

    Identifiers

    CENTRO-03-5673-FEDER-000253
    0 references