TRAINING AS PART OF THE DESIGN AND CONSTRUCTION OF WASTE WATER TREATMENT PLANTS — F.S. (Q351167): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): ADVANCED TRAINING TRAINEESHIP OF THE PIPOL PROGRAMME — PROJECT Has A DURATION OF 6 MONTHS, MIRA A PROFILE OF ADDENT TO THE DESIGN AND THE TREATMENT OF THE TREATMENT OF THE TREATMENT OF THE TREATY OF TREATMENT AND IS HELD WITH A Coloredo * (UD)., Adding English summary)
(‎Changed an Item: Label in wikidata changed)
label / enlabel / en
 
TRAINING AS PART OF THE DESIGN AND CONSTRUCTION OF WASTE WATER TREATMENT PLANTS — F.S.

Revision as of 10:19, 6 March 2020

Project in Italy financed by DG Regio
Language Label Description Also known as
English
TRAINING AS PART OF THE DESIGN AND CONSTRUCTION OF WASTE WATER TREATMENT PLANTS — F.S.
Project in Italy financed by DG Regio

    Statements

    0 references
    1,650.0 Euro
    0 references
    3,300.0 Euro
    0 references
    50.0 percent
    0 references
    20 December 2018
    0 references
    20 August 2019
    0 references
    24 September 2019
    0 references
    ATI 3 - HUB UDINE E BASSA FRIULANA - EN.A.I.P.
    0 references
    0 references
    TIROCINIO FORMATIVO NELL’AMBITO DEL PROGRAMMA PIPOL - PROGETTO OCCUPABILITà. HA UNA DURATA DI 6 MESI, MIRA A FORMARE UN PROFILO DI ADDETTO ALLA PROGETTAZIONE E REALIZZAZIONE DI IMPIANTI TRATTAMENTO ACQUE REFLUE E SI SVOLGE A COLLOREDO *individuo* (UD). (Italian)
    0 references
    ADVANCED TRAINING TRAINEESHIP OF THE PIPOL PROGRAMME — PROJECT Has A DURATION OF 6 MONTHS, MIRA A PROFILE OF ADDENT TO THE DESIGN AND THE TREATMENT OF THE TREATMENT OF THE TREATMENT OF THE TREATY OF TREATMENT AND IS HELD WITH A Coloredo * (UD). (English)
    0 references

    Identifiers

    D97H19000300009
    0 references