NPO-DRR_PC Ljutomer (Q3277606): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying budgets in slovenia one item from slovenia) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
NPO-DRR_PC Ljutomer |
Revision as of 13:43, 27 November 2021
Project Q3277606 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | NPO-DRR_PC Ljutomer |
Project Q3277606 in Slovakia |
Statements
355,450.73 Euro
0 references
473,934.31 Euro
0 references
75.0 percent
0 references
8 December 2019
0 references
31 December 2021
0 references
OBČINA LJUTOMER
0 references
9240
0 references
V okviru projekta bo zgrajeno cestno omrežje z enostranskim hodnikom za pešce, vodovod, fekalna in meteornakanalizacija in javna razsvetljava z naslednjimi dolžinami:Prometna infrastruktura, v skupni dolžini 284,38 m:? Rekonstrukcija dostopne poti s priključkom na reg. cesto od km 0+005,77 do km 0+187,17, v dolžini 181,40 m.? Nova dostopna cesta v dolžini 102,98 m, v asfaltni izvedbi od km 0+187,17 do km 0+290,15, širina 5,5 m.Komunalna infrastruktura:? Meteorna kanalizacija:? Vzdrževalna dela obstoječega meteornega kanalizacijskega sistema v dolžini 195 m.? Izgradnja novega meteornega kanalizacijskega sistema, v dolžini 114 m.Fekalna kanalizacija, 200 m.Vodovod, v skupni dolžini 213 m:Vodna infrastruktura:? protipoplavni ukrepi - nasip na poplavno varno koto.Energetska infrastruktura:? Javna razsvetljava, v skupni dolžini 271 m. (Slovenian)
0 references
The project will build a road network with a single-sided pedestrian, plumbing, faecal and meteornanalisation corridor and public lighting with the following dolžinami:Prometna infrastructure, total length 284.38 m:? Reconstruction of the access path with connection to the road from km 0+ 005,77 to km 0+ 187.17, with a length of 181.40 m.? New accessible road in length 102.98 m, in asphalt version from km 0+ 187.17 to km 0+ 290.15, width 5.5 m.Communal infrastructure:? Meteor sewage:? Maintenance work of an existing meteor sewer system of 195 m in length? Construction of a new meteor sewerage system, in length 114 m.Phical sewerage, 200 m.Water, with a total length of 213 m: Water infrastructure:? floodplain measures — dyke to the flood safe angle.Energy infrastructure:? Public lighting with a total length of 271 m. (English)
19 October 2021
0 references
Identifiers
OP20.07524
0 references