Removal of EB Fibrocement from Barreiro (Q2881961): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: modifying budgets in portugal one item from slovenia)
(‎Changed label, description and/or aliases in fr, and other parts: Adding French translations)
label / frlabel / fr
 
Retrait de Fibrocement EB de Barreiro
Property / summary
 
Il est destiné à fournir la construction de l’école EB Barreiro avec un nouveau toit, le reconstruire avec de nouveaux matériaux sans amiante, qui favorisent au bâtiment un plus grand confort thermique et de meilleures conditions étanches à l’eau, contribuant ainsi à l’augmentation du taux de couverture de la requalification des écoles élémentaires dans l’Union de Bairros d’Alto Seixalinho, Santo André et Verderena. (French)
Property / summary: Il est destiné à fournir la construction de l’école EB Barreiro avec un nouveau toit, le reconstruire avec de nouveaux matériaux sans amiante, qui favorisent au bâtiment un plus grand confort thermique et de meilleures conditions étanches à l’eau, contribuant ainsi à l’augmentation du taux de couverture de la requalification des écoles élémentaires dans l’Union de Bairros d’Alto Seixalinho, Santo André et Verderena. (French) / rank
 
Normal rank
Property / summary: Il est destiné à fournir la construction de l’école EB Barreiro avec un nouveau toit, le reconstruire avec de nouveaux matériaux sans amiante, qui favorisent au bâtiment un plus grand confort thermique et de meilleures conditions étanches à l’eau, contribuant ainsi à l’augmentation du taux de couverture de la requalification des écoles élémentaires dans l’Union de Bairros d’Alto Seixalinho, Santo André et Verderena. (French) / qualifier
 
point in time: 5 December 2021
Timestamp+2021-12-05T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 08:06, 5 December 2021

Project Q2881961 in Portugal
Language Label Description Also known as
English
Removal of EB Fibrocement from Barreiro
Project Q2881961 in Portugal

    Statements

    0 references
    70,990.0 Euro
    0 references
    141,980.0 Euro
    0 references
    50.0 percent
    0 references
    1 June 2020
    0 references
    31 December 2020
    0 references
    MUNICÍPIO DO BARREIRO
    0 references
    0 references

    38°39'35.03"N, 9°4'17.94"W
    0 references
    Pretende-se dotar o edifício da Escola EB Barreiro com uma nova cobertura, reconstruindo-a com novos materiais isentos de amianto, que promovam ao edificado um maior conforto térmico e melhores condições de estanquidade, contribuindo deste modo, para o aumento da taxa de cobertura da requalificação das escolas do ensino básico na União de Freguesias de Alto Seixalinho, Santo André e Verderena. (Portuguese)
    0 references
    It is intended to provide the building of the EB Barreiro School with a new roof, rebuilding it with new materials free of asbestos, that promote to the building greater thermal comfort and better conditions of leakage, thus contributing to the increase of the rate of coverage of the requalification of primary schools in the Union of Freguesias of Alto Seixalinho, Santo André and Verderena. (English)
    7 July 2021
    0 references
    Il est destiné à fournir la construction de l’école EB Barreiro avec un nouveau toit, le reconstruire avec de nouveaux matériaux sans amiante, qui favorisent au bâtiment un plus grand confort thermique et de meilleures conditions étanches à l’eau, contribuant ainsi à l’augmentation du taux de couverture de la requalification des écoles élémentaires dans l’Union de Bairros d’Alto Seixalinho, Santo André et Verderena. (French)
    5 December 2021
    0 references
    Barreiro, União das freguesias de Alto do Seixalinho, Santo André e Verderena
    0 references

    Identifiers

    LISBOA-07-5673-FEDER-000091
    0 references