JR TO RES 2021 — TO DOLB METLIKA (Q3277809): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
Property / intervention field
 
Property / intervention field: Renewable energy: biomass / rank
Normal rank
 

Revision as of 16:04, 20 October 2021

Project Q3277809 in Slovakia
Language Label Description Also known as
English
JR TO RES 2021 — TO DOLB METLIKA
Project Q3277809 in Slovakia

    Statements

    0 references
    224,439.14 Euro
    0 references
    31 March 2021
    0 references
    31 December 2021
    0 references
    ENERGOMONT INVEST D.O.O.
    0 references
    0 references
    0 references

    45°54'19.87"N, 15°36'5.11"E
    0 references
    8250
    0 references
    Predmet projekta je izgradnja daljinskega sistema ogrevanja na obnovljive vire. Predvidena je izgradnja centralne kotlovnice in toplovoda do uporabnikov. Kotlovnica bo na lesno biomaso (sekance), ki se bodo skladiščili v zalogovniku. V obstoječi kotlovnici se bo zamenjal obstoječ LKO kotel z novim, biomasnim kotlom nazivne moči 250 kW, ki bo na letnem nivoju proizvedel 450 MWh toplotne energije. Kotlovnica bo nameščena v obstoječem objektu Srednje trgovske šole, od koder bo potekal, v zemlji, razvod toplote do zunanjih uporabnikov. Za odjem je predvidenih osem (8) odjemnih mest, ki imajo vsaka svojo toplotno postajo ter merilno postajo. V vse se bo distribuiralo 450 MWh toplotne energije. Zgrajen bo toplovodni priključek v skupni dolžini 340 m. Na letnem nivoju je predvidena poraba 615 nasutih metrov gozdnih sekancev. (Slovenian)
    0 references
    The object of the project is the construction of a district heating system using renewable sources. The construction of a central boiler room and a hot water to users is foreseen. The boiler room will be on wood biomass (sekance) which will be stored in the storage room. In the existing boiler room, the existing LKO boiler will be replaced by a new biomass boiler with a rated power of 250 kW, which will produce 450 MWh of thermal energy on an annual basis. The boiler room will be installed in the existing building of the Secondary Trading School, from where it will take place, in the ground, the heat dissipation to outside users. Eight (8) demand points shall be provided for consumption, each with its own thermal and measuring stations. 450 MWh of thermal energy will be distributed to all. A hot-water connection with a total length of 340 m will be built. At the annual level, 615 surrounded meters of wood chips are expected to be consumed. (English)
    19 October 2021
    0 references

    Identifiers

    OP20.07793
    0 references