Installation of five biomass boilers in the Centro de Mayors de Caranza (Q3231369): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): Replacement of a 965 kW natural gas boiler with five biomass boilers of automatic load pellets of 128 kW/ud, for the generation of domestic hot water and heating at the Caranza Majors’ Centre (Ferrol), translated_summary) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Installation of five biomass boilers in the Centro de Mayors de Caranza |
Revision as of 10:12, 14 October 2021
Project Q3231369 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | Installation of five biomass boilers in the Centro de Mayors de Caranza |
Project Q3231369 in Spain |
Statements
15,999,110.4 Euro
0 references
19,998,888.0 Euro
0 references
80.0 percent
0 references
23 March 2017
0 references
7 November 2017
0 references
XUNTA DE GALICIA
0 references
15036
0 references
Sustitución de una caldera de gas natural de 965 kW por cinco calderas de biomasa de pellets de carga automática de 128 kW/ud, para la generación de agua caliente sanitaria y calefacción en el Centro de mayores de Caranza (Ferrol) (Spanish)
0 references
Replacement of a 965 kW natural gas boiler with five biomass boilers of automatic load pellets of 128 kW/ud, for the generation of domestic hot water and heating at the Caranza Majors’ Centre (Ferrol) (English)
14 October 2021
0 references
Ferrol
0 references
Identifiers
048-2018000157
0 references