Installation of five biomass boilers in the Centro de Mayors de Caranza (Q3231369): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): Replacement of a 965 kW natural gas boiler with five biomass boilers of automatic load pellets of 128 kW/ud, for the generation of domestic hot water and heating at the Caranza Majors’ Centre (Ferrol), translated_summary)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
Installation of five biomass boilers in the Centro de Mayors de Caranza

Revision as of 10:12, 14 October 2021

Project Q3231369 in Spain
Language Label Description Also known as
English
Installation of five biomass boilers in the Centro de Mayors de Caranza
Project Q3231369 in Spain

    Statements

    0 references
    15,999,110.4 Euro
    0 references
    19,998,888.0 Euro
    0 references
    80.0 percent
    0 references
    23 March 2017
    0 references
    7 November 2017
    0 references
    XUNTA DE GALICIA
    0 references
    0 references
    0 references

    43°29'4.88"N, 8°13'59.38"W
    0 references
    15036
    0 references
    Sustitución de una caldera de gas natural de 965 kW por cinco calderas de biomasa de pellets de carga automática de 128 kW/ud, para la generación de agua caliente sanitaria y calefacción en el Centro de mayores de Caranza (Ferrol) (Spanish)
    0 references
    Replacement of a 965 kW natural gas boiler with five biomass boilers of automatic load pellets of 128 kW/ud, for the generation of domestic hot water and heating at the Caranza Majors’ Centre (Ferrol) (English)
    14 October 2021
    0 references
    Ferrol
    0 references

    Identifiers

    048-2018000157
    0 references