Improving energy efficiency in buildings and public facilities in Paterna. (Q3193081): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The operation consists of improving energy efficiency in buildings and public facilities in Paterna. It is carried out in two phases:_x000D_ • A first phase consisting of carrying out energy audits (ENERGY EFICIENCE CERTIFICATIONS). These will determine the current consumption of the buildings selected for action. Among the buildings are: Colegio ANTONIO FERRANDIS, COLEGIO Ausias MARCH, CEIP LLOMA LLARGA, FUENT FUENT SCHOOL of the jug, COLEGIO S...) |
(Changed label, description and/or aliases in en: translated_label) |
||
label / en | label / en | ||
Improving energy efficiency in buildings and public facilities in Paterna. |
Revision as of 21:59, 12 October 2021
Project Q3193081 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving energy efficiency in buildings and public facilities in Paterna. |
Project Q3193081 in Spain |
Statements
225,157.5 Euro
0 references
450,315.0 Euro
0 references
50.0 percent
0 references
15 July 2019
0 references
31 December 2020
0 references
AYUNTAMIENTO DE PATERNA
0 references
46190
0 references
La operación consiste en la mejora de la eficiencia energética en edificios e instalaciones públicas de Paterna, se desarrolla en dos fases:_x000D_ • Una primera fase consistente en la realización de auditorías energéticas (CERTIFICACIONES DE EFICIENCIA ENERGÉTICA). Mediante éstas se determinará el consumo actual de los edificios seleccionados para la actuación. Entre las edificaciones se encuentran: COLEGIO ANTONIO FERRANDIS, COLEGIO AUSIAS MARCH, CEIP LLOMA LLARGA, ESCUELA INFANTIL FUENTE DEL JARRO, COLEGIO SANCHIS GUARNER _x000D_ • En una segunda fase, se ejecutarán instalaciones de energía solar fotovoltaicas como medida que permita reducir los consumos energéticos con energía convencional en los edificios auditados. Tal y como establecen los criterios para la selección de operaciones, todas las actuaciones en edificios públicos tomarán como base la clasificación energética inicial y buscarán mejoras significativas (de por lo menos una letra de clasificación energética), de acuerdo con el Real Decreto 235/2013 de 5 abril por el que se aprueba el procedimiento básico para la certificación de la eficiencia energética de los edificios. Una vez finalizada, se llevará a cabo una certificación final de los edificios en los que se ha actuado para determinar los ahorros energéticos conseguidos_x000D_ 1. Protección del medio ambiente y reducción de la emisión de CO2_x000D_ 2. Reducción de costes energéticos (Spanish)
0 references
The operation consists of improving energy efficiency in buildings and public facilities in Paterna. It is carried out in two phases:_x000D_ • A first phase consisting of carrying out energy audits (ENERGY EFICIENCE CERTIFICATIONS). These will determine the current consumption of the buildings selected for action. Among the buildings are: Colegio ANTONIO FERRANDIS, COLEGIO Ausias MARCH, CEIP LLOMA LLARGA, FUENT FUENT SCHOOL of the jug, COLEGIO SANCHIS GUARNER _x000D_ • In a second phase, photovoltaic solar energy installations will be implemented as a measure to reduce energy consumption with conventional energy in the audited buildings. As set out in the criteria for the selection of operations, all actions in public buildings will be based on the initial energy classification and will seek significant improvements (of at least one energy classification letter), in accordance with Royal Decree 235/2013 of 5 April 2013 approving the basic procedure for certification of the energy performance of buildings. Once completed, a final certification will be carried out for the buildings in which action has been taken to determine the energy savings achieved_x000D_ 1. Protection of the environment and reduction of CO2_x000D_ 2. Reduction of energy costs (English)
12 October 2021
0 references
Paterna
0 references
Identifiers
FCL01CV2625
0 references