DESIGN AND DEVELOPMENT OF ELECTRIC VEHICLE CHARGING STATIONS (Q3173790): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The objective of this project is the design, development and validation of fast charging stations for electric vehicles. The stations will include 50 kW charging poles, considering the possibility of increasing this power so that the charging time can be reduced. The project will include two different topologies, one connected to the Half Voltage network and one connected to the Low Voltage network. We will also consider the possibility of imple...) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
CONCEPTION ET DÉVELOPPEMENT DE BORNES DE RECHARGE POUR VÉHICULES ÉLECTRIQUES | |||||||||||||||
Property / summary | |||||||||||||||
L’objectif de ce projet est la conception, le développement et la validation de bornes de recharge rapides pour véhicules électriques. Les stations comprendront des poteaux de charge de 50 kW, compte tenu de la possibilité d’augmenter cette puissance afin de réduire le temps de charge. Le projet comprendra deux topologies différentes, l’une connectée au réseau de demi-tension et l’autre connectée au réseau basse tension. Nous examinerons également la possibilité de mettre en œuvre le stockage d’énergie._x000D_ _x000D_ Pour atteindre cet objectif, l’étude des réglementations applicables aux installations de recharge des véhicules électriques, ainsi que des exigences actuelles en matière de sécurité et d’isolation, sera étudiée en détail les solutions de pointe existantes en matière de recharge des véhicules électriques, les topologies seront revues et de nouvelles configurations et topologies pour améliorer les performances des équipements disponibles sur le marché seront étudiées aujourd’hui. Les résultats de ces analyses se concrétiseront dans des prototypes qui seront fabriqués pour validation ultérieure._x000D_ _x000D_ Toutes ces tâches ont été regroupées en un total de quatre activités: Dans la première, les principales études seront réalisées pour définir les exigences du nouveau système. Il effectuera ensuite la conception et la vérification complètes des prototypes (mécanique, électronique, dessins électriques, électronique de puissance et logiciels), qui seront fabriqués pour validation ultérieure. Les résultats des tests de validation seront traités par l’équipe de conception, qui apportera les modifications nécessaires pour répondre aux exigences spécifiées._x000D_ _x000D_ La mise en œuvre et la coordination appropriées de ces activités permettront à Power Electronics d’intégrer dans son portefeuille un nouvel équipement, sensiblement amélioré par rapport à la concurrence. (French) | |||||||||||||||
Property / summary: L’objectif de ce projet est la conception, le développement et la validation de bornes de recharge rapides pour véhicules électriques. Les stations comprendront des poteaux de charge de 50 kW, compte tenu de la possibilité d’augmenter cette puissance afin de réduire le temps de charge. Le projet comprendra deux topologies différentes, l’une connectée au réseau de demi-tension et l’autre connectée au réseau basse tension. Nous examinerons également la possibilité de mettre en œuvre le stockage d’énergie._x000D_ _x000D_ Pour atteindre cet objectif, l’étude des réglementations applicables aux installations de recharge des véhicules électriques, ainsi que des exigences actuelles en matière de sécurité et d’isolation, sera étudiée en détail les solutions de pointe existantes en matière de recharge des véhicules électriques, les topologies seront revues et de nouvelles configurations et topologies pour améliorer les performances des équipements disponibles sur le marché seront étudiées aujourd’hui. Les résultats de ces analyses se concrétiseront dans des prototypes qui seront fabriqués pour validation ultérieure._x000D_ _x000D_ Toutes ces tâches ont été regroupées en un total de quatre activités: Dans la première, les principales études seront réalisées pour définir les exigences du nouveau système. Il effectuera ensuite la conception et la vérification complètes des prototypes (mécanique, électronique, dessins électriques, électronique de puissance et logiciels), qui seront fabriqués pour validation ultérieure. Les résultats des tests de validation seront traités par l’équipe de conception, qui apportera les modifications nécessaires pour répondre aux exigences spécifiées._x000D_ _x000D_ La mise en œuvre et la coordination appropriées de ces activités permettront à Power Electronics d’intégrer dans son portefeuille un nouvel équipement, sensiblement amélioré par rapport à la concurrence. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L’objectif de ce projet est la conception, le développement et la validation de bornes de recharge rapides pour véhicules électriques. Les stations comprendront des poteaux de charge de 50 kW, compte tenu de la possibilité d’augmenter cette puissance afin de réduire le temps de charge. Le projet comprendra deux topologies différentes, l’une connectée au réseau de demi-tension et l’autre connectée au réseau basse tension. Nous examinerons également la possibilité de mettre en œuvre le stockage d’énergie._x000D_ _x000D_ Pour atteindre cet objectif, l’étude des réglementations applicables aux installations de recharge des véhicules électriques, ainsi que des exigences actuelles en matière de sécurité et d’isolation, sera étudiée en détail les solutions de pointe existantes en matière de recharge des véhicules électriques, les topologies seront revues et de nouvelles configurations et topologies pour améliorer les performances des équipements disponibles sur le marché seront étudiées aujourd’hui. Les résultats de ces analyses se concrétiseront dans des prototypes qui seront fabriqués pour validation ultérieure._x000D_ _x000D_ Toutes ces tâches ont été regroupées en un total de quatre activités: Dans la première, les principales études seront réalisées pour définir les exigences du nouveau système. Il effectuera ensuite la conception et la vérification complètes des prototypes (mécanique, électronique, dessins électriques, électronique de puissance et logiciels), qui seront fabriqués pour validation ultérieure. Les résultats des tests de validation seront traités par l’équipe de conception, qui apportera les modifications nécessaires pour répondre aux exigences spécifiées._x000D_ _x000D_ La mise en œuvre et la coordination appropriées de ces activités permettront à Power Electronics d’intégrer dans son portefeuille un nouvel équipement, sensiblement amélioré par rapport à la concurrence. (French) / qualifier | |||||||||||||||
point in time: 4 December 2021
|
Revision as of 13:08, 4 December 2021
Project Q3173790 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | DESIGN AND DEVELOPMENT OF ELECTRIC VEHICLE CHARGING STATIONS |
Project Q3173790 in Spain |
Statements
410,877.0 Euro
0 references
821,754.0 Euro
0 references
50.0 percent
0 references
4 June 2018
0 references
30 June 2019
0 references
POWER ELECTRONICS ESPAÑA SL
0 references
46190
0 references
El objetivo del presente proyecto es el diseño, desarrollo y validación de estaciones de carga rápida de vehículos eléctricos. Las estaciones inclurán los postes de recarga de 50 kW, contemplando la posibilidad de incrementar esta potencia de manera que se pueda reducir el tiempo de carga. El proyecto contemplará dos topologías diferentes, una conectable a la red de Media Tensión y otra conectable a la red de Baja Tensión. También se contemplará la posibilidad de implementar almacenamiento de energía._x000D_ _x000D_ Para abordar este objetivo, se realizará el estudio de la normativa aplicabe a las instalaciones de carga de vehículos eléctricos, y de los requerimientos vigentes en cuanto a seguridad y aislamiento, se estudiarán detalladamente las soluciones existentes en el estado del arte relacionadas con carga de vehículo eléctrico, se revisarán la topologías y se estudiarán nuevas configuraciones y topologías que mejoren las prestaciones de los equipos disponibles en el mercado en la actualidad. Los resultados de estos análisis se materializarán en diseños de prototipos que serán fabricados para su posterior validación._x000D_ _x000D_ Todas estas tareas se han agrupado en un total de cuatro actividades: En la primera de ellas se llevarán a cabo los principales estudios para definir los requerimientos del nuevo sistema. Posteriormente llevará a cabo el diseño y verificación íntegro de los prototipos (mecánica, electrónica, planos eléctricos, electrónica de potencia y software), los cuales serán fabricados para su posterior validación. Los resultados de las pruebas de validación serán tratados por el equipo de diseño, que realizará las modificaciones oportunas para cumplir con los requerimientos especificados._x000D_ _x000D_ La realización y coordinación adecuada de estas actividades permitirá a Power Electronics incorporar a su portfolio un nuevo equipo, mejorado sustancialmente respecto a la competencia. (Spanish)
0 references
The objective of this project is the design, development and validation of fast charging stations for electric vehicles. The stations will include 50 kW charging poles, considering the possibility of increasing this power so that the charging time can be reduced. The project will include two different topologies, one connected to the Half Voltage network and one connected to the Low Voltage network. We will also consider the possibility of implementing energy storage._x000D_ _x000D_ To address this objective, the study of the regulations applicable to charging installations of electric vehicles, and of the current safety and insulation requirements, will be studied in detail the existing state-of-the-art solutions related to electric vehicle charging, the topologies will be reviewed and new configurations and topologies to improve the performance of the equipment available on the market today will be studied. The results of these analyses will materialise in prototype designs that will be manufactured for subsequent validation._x000D_ _x000D_ All these tasks have been grouped into a total of four activities: In the first of these, the main studies will be carried out to define the requirements of the new system. It will then carry out the complete design and verification of the prototypes (mechanics, electronics, electrical drawings, power electronics and software), which will be manufactured for subsequent validation. The results of the validation tests will be processed by the design team, which will make the necessary modifications to meet the specified requirements._x000D_ _x000D_ The proper implementation and coordination of these activities will allow Power Electronics to incorporate into its portfolio a new equipment, substantially improved compared to the competition. (English)
12 October 2021
0 references
L’objectif de ce projet est la conception, le développement et la validation de bornes de recharge rapides pour véhicules électriques. Les stations comprendront des poteaux de charge de 50 kW, compte tenu de la possibilité d’augmenter cette puissance afin de réduire le temps de charge. Le projet comprendra deux topologies différentes, l’une connectée au réseau de demi-tension et l’autre connectée au réseau basse tension. Nous examinerons également la possibilité de mettre en œuvre le stockage d’énergie._x000D_ _x000D_ Pour atteindre cet objectif, l’étude des réglementations applicables aux installations de recharge des véhicules électriques, ainsi que des exigences actuelles en matière de sécurité et d’isolation, sera étudiée en détail les solutions de pointe existantes en matière de recharge des véhicules électriques, les topologies seront revues et de nouvelles configurations et topologies pour améliorer les performances des équipements disponibles sur le marché seront étudiées aujourd’hui. Les résultats de ces analyses se concrétiseront dans des prototypes qui seront fabriqués pour validation ultérieure._x000D_ _x000D_ Toutes ces tâches ont été regroupées en un total de quatre activités: Dans la première, les principales études seront réalisées pour définir les exigences du nouveau système. Il effectuera ensuite la conception et la vérification complètes des prototypes (mécanique, électronique, dessins électriques, électronique de puissance et logiciels), qui seront fabriqués pour validation ultérieure. Les résultats des tests de validation seront traités par l’équipe de conception, qui apportera les modifications nécessaires pour répondre aux exigences spécifiées._x000D_ _x000D_ La mise en œuvre et la coordination appropriées de ces activités permettront à Power Electronics d’intégrer dans son portefeuille un nouvel équipement, sensiblement amélioré par rapport à la concurrence. (French)
4 December 2021
0 references
Paterna
0 references
Identifiers
IDI-20190089
0 references