Expansion of the Parque de los Bajos model. Beach-Commercial Center connection (Q3183585): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): Connection by green route of the Paseo Marítimo (area where the tourist activity is concentrated) both with the Gran Plaza Shopping Centre (important destination of travels) and with the urban center and the equipment that are hosted there (bus station, sports pavilion, etc.). Improvement of the urban space of that connection and its environment., remove_old_english_translation)
(‎Created claim: summary (P836): Connection by green route of the Paseo Marítimo (area where the tourist activity is concentrated) both with the Gran Plaza Shopping Centre (important destination of travels) and with the urban center and the equipment that are hosted there (bus station, sports pavilion, etc.). Improvement of the urban space of that connection and its environment., translated_summary)
Property / summary
 
Connection by green route of the Paseo Marítimo (area where the tourist activity is concentrated) both with the Gran Plaza Shopping Centre (important destination of travels) and with the urban center and the equipment that are hosted there (bus station, sports pavilion, etc.). Improvement of the urban space of that connection and its environment. (English)
Property / summary: Connection by green route of the Paseo Marítimo (area where the tourist activity is concentrated) both with the Gran Plaza Shopping Centre (important destination of travels) and with the urban center and the equipment that are hosted there (bus station, sports pavilion, etc.). Improvement of the urban space of that connection and its environment. (English) / rank
 
Normal rank
Property / summary: Connection by green route of the Paseo Marítimo (area where the tourist activity is concentrated) both with the Gran Plaza Shopping Centre (important destination of travels) and with the urban center and the equipment that are hosted there (bus station, sports pavilion, etc.). Improvement of the urban space of that connection and its environment. (English) / qualifier
 
point in time: 12 October 2021
Timestamp+2021-10-12T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 21:16, 12 October 2021

Project Q3183585 in Spain
Language Label Description Also known as
English
Expansion of the Parque de los Bajos model. Beach-Commercial Center connection
Project Q3183585 in Spain

    Statements

    0 references
    1,113,600.0 Euro
    0 references
    1,392,000.0 Euro
    0 references
    80.0 percent
    0 references
    1 September 2018
    0 references
    31 December 2022
    0 references
    AYUNTAMIENTO DE ROQUETAS DE MAR
    0 references
    0 references

    36°45'46.87"N, 2°36'41.72"W
    0 references
    04079
    0 references
    Conexión por vía verde del Paseo Marítimo (zona donde se concentra la actividad turística) tanto con El Centro Comercial Gran Plaza (importante destino de desplazamientos) como con el centro Urbano y los equipamientos que allí se alojan (Estación de Autobuses, Pabellón deportivo, etc.). Mejora del espacio urbano de esa conexión y su entorno. (Spanish)
    0 references
    Connection by green route of the Paseo Marítimo (area where the tourist activity is concentrated) both with the Gran Plaza Shopping Centre (important destination of travels) and with the urban center and the equipment that are hosted there (bus station, sports pavilion, etc.). Improvement of the urban space of that connection and its environment. (English)
    12 October 2021
    0 references
    Roquetas de Mar
    0 references

    Identifiers

    FCL02AN7006
    0 references