IMPLEMENTATION OF MEASURES TO SAVE AND IMPROVE ENERGY EFFICIENCY IN THE PAVILION OF THE MUNICIPAL COMPLEX CITY OF TUDELA (Q3169989): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: summary (P836): It is this operation of the reform of the sports hall located within the Municipal Complex City of Tudela, located specifically in Avda. Argentina s/n. This complex began to be built in 1972 with the construction of the first summer pools and an outdoor fronton. On the same in 1983 this Pavilion was built which requires a major reform in order to make it more accessible and, above all, the implementation of measures to save and improve energy...)
(‎Created claim: summary (P836): It is this operation of the reform of the sports hall located within the Municipal Complex City of Tudela, located specifically in Avda. Argentina s/n. This complex began to be built in 1972 with the construction of the first summer pools and an outdoor fronton. On the same in 1983 this Pavilion was built which requires a major reform in order to make it more accessible and, above all, the implementation of measures to save and improve energy ef...)
Property / summary
 
It is this operation of the reform of the sports hall located within the Municipal Complex City of Tudela, located specifically in Avda. Argentina s/n. This complex began to be built in 1972 with the construction of the first summer pools and an outdoor fronton. On the same in 1983 this Pavilion was built which requires a major reform in order to make it more accessible and, above all, the implementation of measures to save and improve energy efficiency in it. (English)
Property / summary: It is this operation of the reform of the sports hall located within the Municipal Complex City of Tudela, located specifically in Avda. Argentina s/n. This complex began to be built in 1972 with the construction of the first summer pools and an outdoor fronton. On the same in 1983 this Pavilion was built which requires a major reform in order to make it more accessible and, above all, the implementation of measures to save and improve energy efficiency in it. (English) / rank
 
Normal rank
Property / summary: It is this operation of the reform of the sports hall located within the Municipal Complex City of Tudela, located specifically in Avda. Argentina s/n. This complex began to be built in 1972 with the construction of the first summer pools and an outdoor fronton. On the same in 1983 this Pavilion was built which requires a major reform in order to make it more accessible and, above all, the implementation of measures to save and improve energy efficiency in it. (English) / qualifier
 
point in time: 12 October 2021
Timestamp+2021-10-12T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 17:29, 12 October 2021

Project Q3169989 in Spain
Language Label Description Also known as
English
IMPLEMENTATION OF MEASURES TO SAVE AND IMPROVE ENERGY EFFICIENCY IN THE PAVILION OF THE MUNICIPAL COMPLEX CITY OF TUDELA
Project Q3169989 in Spain

    Statements

    0 references
    0 references
    7,746,248.5 Euro
    0 references
    15,492,497.0 Euro
    0 references
    50.0 percent
    0 references
    16 April 2018
    0 references
    31 December 2018
    0 references
    AYUNTAMIENTO DE TUDELA
    0 references

    42°3'50.29"N, 1°36'19.22"W
    0 references
    31232
    0 references
    Se trata esta operación de la Reforma del Pabellón Deportivo ubicado dentro del Complejo Municipal Ciudad de Tudela, ubicado concretamente en Avda. Argentina s/n. Este complejo comenzo a construirse en el año 1972 con la construcción de las primeras piscinas de verano y un fronton al aire libre. Sobre el mismo en el año 1983 se construyo este Pabellón el cual requiere una importante reforma para dotarlo de una mayor accesibilidad y sobre todo la implementación de actuaciones de ahorro y mejora de la eficiencia energética en el mismo (Spanish)
    0 references
    It is this operation of the reform of the sports hall located within the Municipal Complex City of Tudela, located specifically in Avda. Argentina s/n. This complex began to be built in 1972 with the construction of the first summer pools and an outdoor fronton. On the same in 1983 this Pavilion was built which requires a major reform in order to make it more accessible and, above all, the implementation of measures to save and improve energy efficiency in it. (English)
    12 October 2021
    0 references
    Tudela
    0 references

    Identifiers

    FCL01NA0103
    0 references