EXPANSION OF THE IDAM OF MELILLA (Q3215053): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed label, description and/or aliases in en: translated_label)
label / enlabel / en
 
EXPANSION OF THE IDAM OF MELILLA

Revision as of 08:37, 12 October 2021

Project Q3215053 in Spain
Language Label Description Also known as
English
EXPANSION OF THE IDAM OF MELILLA
Project Q3215053 in Spain

    Statements

    0 references
    0 references
    11,934,045.6 Euro
    0 references
    14,917,557.0 Euro
    0 references
    80.0 percent
    0 references
    6 September 2020
    0 references
    6 December 2022
    0 references
    CONFEDERACION HIDROGRAFICA DEL GUADALQUIVIR
    0 references
    0 references
    0 references

    35°17'34.48"N, 2°57'2.59"W
    0 references
    52001
    0 references
    El objeto del presente proyecto es la ampliación de la planta Desaladora de Agua Marina de Melilla para abastecer a la ciudad de Melilla._x000D_ Tras la ampliación de la planta, el caudal de agua pasará de 20.000 m3/día a los _x000D_ 29.490 m3/día con puntas de 31.657 m3/día para poder absorber las paradas _x000D_ programadas que se consideran de un (1) mes._x000D_ Además, se llevarán a cabo diversas mejoras a las necesidades observadas durante la _x000D_ explotación. (Spanish)
    0 references
    The purpose of this project is the expansion of the Melilla Marina Water Desalination Plant to supply the city of Melilla._x000D_ After the expansion of the plant, the water flow will increase from 20,000 m3 / day to_x000D_ 29,490 m3 / day with tips of 31,657 m3 / day to be able to absorb the stops_x000D_ scheduled that are considered one (1) month._x000D_ In addition, various improvements will be made to the needs observed during the_x000D_ exploitation. (English)
    0 references
    Melilla
    0 references

    Identifiers

    ME6266
    0 references