Broadband infrastructure in NGA white areas in Buzau county (Q3100375): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Bucureşti / rank
 
Normal rank

Revision as of 01:42, 10 October 2021

Project Q3100375 in Romania
Language Label Description Also known as
English
Broadband infrastructure in NGA white areas in Buzau county
Project Q3100375 in Romania

    Statements

    0 references
    0 references
    0 references
    18,364,190.96 Romanian Leu
    0 references
    3,672,838.1920000003 Euro
    13 September 2021
    0 references
    26,711,105.64 Romanian Leu
    0 references
    5,342,221.1280000005 Euro
    13 September 2021
    0 references
    68.75 percent
    0 references
    13 June 2019
    0 references
    12 June 2022
    0 references
    INVITE SYSTEMS SRL
    0 references
    0 references

    44°29'25.01"N, 26°10'38.21"E
    0 references

    45°29'52.40"N, 26°25'59.02"E
    0 references

    44°26'10.64"N, 26°6'23.29"E
    0 references

    45°14'47.90"N, 27°8'13.09"E
    0 references

    45°18'18.86"N, 27°17'15.32"E
    0 references

    45°16'8.98"N, 27°12'22.68"E
    0 references

    45°20'40.60"N, 27°20'54.74"E
    0 references

    45°17'7.51"N, 27°4'38.64"E
    0 references

    45°25'49.22"N, 26°30'36.90"E
    0 references

    45°6'6.01"N, 24°18'15.37"E
    0 references

    45°20'47.72"N, 26°39'55.94"E
    0 references

    45°3'36.68"N, 27°3'55.04"E
    0 references

    44°56'30.30"N, 26°1'25.14"E
    0 references

    45°15'6.62"N, 26°17'29.69"E
    0 references

    45°20'59.28"N, 26°12'56.05"E
    0 references

    45°14'43.73"N, 26°22'34.54"E
    0 references

    45°28'42.85"N, 26°15'56.45"E
    0 references
    Obiectivul principal al proiectului este dezvoltarea infrastructurii de internet in banda larga, in zonele albe NGA din judetul Buzau, cu o larga răspândire a nodurilor de comunicaţii şi partea de transmisie a datelor (backbone şi blackhaul), cât mai aproape de utilizatorul final și cu niveluri adecvate de simetrie și de interactivitate, pentru a garanta transmitere mai bună de informații în ambele sensuri. Prin introducerea conexiunii de tip Next Generation Access se va facilita accesul la internet pentru echipamente moderne TIC, rezultand consolidarea infrastructurii TIC, si se asigura accesul public la infrastructura nationala informationala si in zonele albe NGA. Proiectul va asigura utilizatorilor finali obiectivele minime de calitate, respectiv: a. viteze de transfer (download) a datelor în regim ”best effort” – minim 30 Mbps; b. grad de disponibilitate a serviciului de acces la internet - > 99% din timpul serviciului c. latența - ≤ 100ms, cu excepția tehnologiei prin satelit, unde poate fi ≤ 700ms d. jitter ≤ 50 ms De asemenea, in furnizarea serviciilor realizate in cadrul proiectului, se va respecta legislatia in domeniul comunicatiilor electronice si se va oferi acces deschis la rețelele de comunicații electronice și la infrastructurile fizice aferente acestora, in conformitate cu prevederile Ghidului si cu Decizia Președintelui ANCOM nr. 502/2018. (Romanian)
    0 references
    The main objective of the project is to develop the broadband internet infrastructure in the white NGA areas of Buzau county, with a wide spread of communication nodes and the data transmission part (backbone and blackhaul), as close as possible to the end user and with adequate levels of symmetry and interactivity, in order to guarantee better transmission of information in both directions. By introducing the Next Generation Access connection, we will facilitate access to the internet for modern ICT equipment, resulting in the strengthening of the ICT infrastructure, and ensure public access to the national information infrastructure and in the white NGA areas. The project will ensure the minimum quality objectives for end-users, namely: a. “best effort” data download speeds – minimum 30 Mbps; b. availability of the internet access service – > 99 % of the service time c. latence – ≤ 100ms, except for satellite technology, where it can be ≤ 700ms d. jitter ≤ 50 ms. Also, in the provision of the services performed within the project, the legislation in the field of electronic communications will be complied with and open access to the electronic communications networks and the related physical infrastructures will be provided, in accordance with the provisions of the Guide and Decision No 502/2018 of the President of ANCOM. (English)
    16 September 2021
    0 references
    Bălăceanu, Romania
    0 references
    Municipiul Ploieşti, Romania
    0 references
    Oraş Voluntari, Romania
    0 references
    Ziduri, Romania
    0 references
    Vâlcelele, Romania
    0 references
    Siriu, Romania
    0 references
    Scorţoasa, Romania
    0 references
    Gura Teghii, Romania
    0 references
    Ghergheasa, Romania
    0 references
    Cislău, Romania
    0 references
    Cilibia, Romania
    0 references
    Chiojdu, Romania
    0 references
    Calvini, Romania
    0 references
    C.A. Rosetti, Romania
    0 references
    Buda, Romania
    0 references
    Braesti, Romania
    0 references
    Balta Albă, Romania
    0 references

    Identifiers

    126343
    0 references