Rehabilitation DN56, Craiova-Calafat, km 0+ 000 + km 84+ 020 (phase II) (Q3099210): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Dolj / rank
 
Normal rank

Revision as of 21:30, 9 October 2021

Project Q3099210 in Romania
Language Label Description Also known as
English
Rehabilitation DN56, Craiova-Calafat, km 0+ 000 + km 84+ 020 (phase II)
Project Q3099210 in Romania

    Statements

    0 references
    0 references
    0 references
    69,396,558.27 Romanian Leu
    0 references
    13,879,311.654 Euro
    13 September 2021
    0 references
    81,643,009.72 Romanian Leu
    0 references
    16,328,601.944 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    31 July 2017
    0 references
    31 December 2023
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references

    44°19'8.47"N, 23°47'47.62"E
    0 references

    43°59'39.48"N, 22°56'1.32"E
    0 references
    Reabilitare a 80,435 km, construirea a 2 poduri noi, 5 poduri reabilitate, 67 podete si 17 intersectii. De asemenea, reabilitarea celor 12 spatii de parcare existente. Imbunatatirea conditiilor generale de circulatie, ca urmare a realizarii rutei de ocolire, conduc la obtinerea unor economii de intre 60% si 62% iar exprimate in minute, castigul de timp se situeaza intre 12,3 minute (pentru autoturisme) si 13,8 minute pentru vehicule grele. (Romanian)
    0 references
    Rehabilitation of 80,435 km, construction of 2 new bridges, 5 rehabilitated bridges, 67 bridges and 17 intersections. Also, rehabilitation of the 12 existing parking spaces. The improvement of the general traffic conditions, as a result of the bypass route, leads to savings of between 60 % and 62 % and expressed in minutes, the time gain is between 12.3 minutes (for cars) and 13.8 minutes for heavy vehicles. (English)
    16 September 2021
    0 references
    Municipiul Calafat, Romania
    0 references
    Municipiul Craiova, Romania
    0 references

    Identifiers

    110638
    0 references