ENERGY OPTIMISATION OF METAL PACKAGING PRODUCTION (Q3177896): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en: translated_label) |
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
||||||||||
Property / coordinate location | |||||||||||
42°26'42.61"N, 2°17'28.93"W
| |||||||||||
Property / coordinate location: 42°26'42.61"N, 2°17'28.93"W / rank | |||||||||||
Normal rank |
Revision as of 15:32, 9 October 2021
Project Q3177896 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | ENERGY OPTIMISATION OF METAL PACKAGING PRODUCTION |
Project Q3177896 in Spain |
Statements
337,225.5 Euro
0 references
674,451.0 Euro
0 references
50.0 percent
0 references
26 February 2016
0 references
28 October 2018
0 references
AUXILIAR CONSERVERA, S.A.
0 references
26002
0 references
Optimización del consumo energético de tres líneas de producción mediante la modificación de los finales de línea, concretamente los equipos de paletizado, que permitirá adecuar el régimen de producción cada línea a la máxima eficiencia posible (Spanish)
0 references
Optimization of the energy consumption of three production lines through the modification of the line ends, specifically the palletizing equipment, which will allow to adapt the production regime each line to the maximum possible efficiency (English)
0 references
Agoncillo
0 references
Identifiers
FN15IND00483
0 references