Q3214071 (Q3214071): Difference between revisions
Jump to navigation
Jump to search
(Changed label, description and/or aliases in en) |
(Changed an Item: Edited by the infer coords bot - inferring coordinates from location) |
||||||||||
Property / coordinate location | |||||||||||
43°18'33.41"N, 6°29'31.02"W
| |||||||||||
Property / coordinate location: 43°18'33.41"N, 6°29'31.02"W / rank | |||||||||||
Normal rank |
Revision as of 16:11, 10 October 2021
Project Q3214071 in Spain
Language | Label | Description | Also known as |
---|---|---|---|
English | No label defined |
Project Q3214071 in Spain |
Statements
13,808.0 Euro
0 references
17,260.0 Euro
0 references
80.0 percent
0 references
17 June 2015
0 references
31 December 2016
0 references
PELLETS ASTURIAS SL
0 references
33073
0 references
Implantación de modelos innovadores de adquisición y gestión de biomasa forestal para lograr un incremento del rendimiento energético. Se persigue un triple efecto: reducción del coste de fabricación, mejora de la eficiencia energética, e incremento de toneladas procesadas por unidad de tiempo. El proyecto se estructura en las siguientes Tareas:_x000D_ - Tarea 1: Desarrollo modelo de producción asociado a la calidad de la materia prima _x000D_ - Tarea 2: Desarrollo modelos de producción de energía eléctrica y térmica asociados a la calidad de la materia prima_x000D_ - Tarea 3: Definición de estrategias y modelos de adquisición de materia prima asociado a rendimiento energético (Spanish)
0 references
Implementation of innovative models for acquiring and processing forest biomass to achieve increased energy performance. The project aims for a triple effect: reduced manufacturing costs, improved energy efficiency, and increase in tonnes processed per unit of time. The project is structured into the following tasks:_x000D_ - Task 1: Develop a production model linked to the quality of the raw material _x000D_ - Task 2: Develop production models for electrical and thermal energy linked to the quality of the raw material _x000D_ - Task 3: Define strategies and models for procuring raw material linked to energy performance (English)
0 references
Tineo
0 references
Identifiers
IDE/2015/000344
0 references