Integral remodeling of Calle La Paz in the Boquetillo neighborhood (Q3148973): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the infer coords bot - inferring coordinates from location)
Property / coordinate location
 
36°32'19.61"N, 4°37'23.99"W
Latitude36.5387779
Longitude-4.6233348
Precision1.0E-5
Globehttp://www.wikidata.org/entity/Q2
Property / coordinate location: 36°32'19.61"N, 4°37'23.99"W / rank
 
Normal rank

Revision as of 10:59, 9 October 2021

Project Q3148973 in Spain
Language Label Description Also known as
English
Integral remodeling of Calle La Paz in the Boquetillo neighborhood
Project Q3148973 in Spain

    Statements

    0 references
    79,560,148.8 Euro
    0 references
    99,450,186.0 Euro
    0 references
    80.0 percent
    0 references
    1 October 2020
    0 references
    30 September 2021
    0 references
    AYUNTAMIENTO DE FUENGIROLA
    0 references

    36°32'19.61"N, 4°37'23.99"W
    0 references
    29054
    0 references
    Se trata de una operación destinada a la regeneración del entorno urbano en el barrio de “El Boquetillo”, en concreto de la Calle La Paz que es un eje troncal interior del barrio. Se trata de la zona más vulnerable de la ciudad. Tiene su origen en un antiguo barrio de pescadores que procedían de viviendas en mal estado del paseo marítimo y que fue desarrollándose poco a poco gracias a convenios con entidades financieras que posibilitaron la adquisición de viviendas dignas. Actualmente, se trata de una gran aglomeración urbanística, donde reside la mayor proporción de población inmigrante del municipio y que sufre altas tasas de desempleo y problemas de exclusión social. La operación que se va a ejecutar es la remodelación integral de una de las vías centrales de este barrio, dotándolo de mejores y más modernas instalaciones e infraestructuras. _x000D_ _x000D_ Entre las acciones contempladas en la operación se recogen actuaciones sobre el mobiliario urbano, mejora de la accesibilidad de la zona, actuaciones de embellecimiento y modernización del entorno, intervenciones en dotaciones públicas y en los sistemas de abastecimiento, saneamiento, mejora de la eficiencia energética del alumbrado público y en los sistemas de recogida de residuos entre otras. Todo ello al objeto de revitalizar este barrio que debido a sus especiales condiciones urbanas, sociales, económicas y demográficas, precisa de actuaciones que reduzcan los desequilibrios que presenta respecto al resto del municipio. (Spanish)
    0 references
    It is an operation whose object is the regeneration of the urban area of the “El Boquetillo”, specifically of Calle La Paz a main axis of said neighbourhood. It is the most vulnerable area of town. Its origins hail back to a fishermans' neighbourhood of shanty dwellings along the promenade that gradually began to expand and through time with the help of financial institutions eventually became more repectable buildings. Currently, we are talking of a large urban sprawl which houses the majority of the inmigrant population of the municipality with high unemployment and social exclusion levels. This operation entails the complete overhaul of a main artery of the neighbourhood, providing upgraded facilities and state of the art infrastructure. Amongst the proceedings to be carried out, we can mention urban furniture improvements, better accessibility to the area, cosmetic and modernization measures, works on public facilities and services, energy efficiency improvement of street lighting and waste disposal systems inter alia. All the above in aid to revitalise this neighbourhood that due to its specific urban, social, economic and demographic conditions, requires measures which reduce the inequality with respect to the rest of the municipality. (English)
    0 references
    Fuengirola
    0 references

    Identifiers

    FCL3AN10902
    0 references