5.1b Reduction of the energy performance of the building — Netoice Institute (Q73370): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Created claim: summary (P836): As part of the project, a forced ventilation system will be installed with recovery. A hot return device shall ensure permanently satisfactory parameters of the internal environment in the classroom and in the musical room and lead to a reduction in heat loss by ventilation, i.e. to the overall reduction of the energy performance of the building. This is a comprehensive project to reduce the energy performance of the building combined in two app...)
(‎Removed claim: co-financing rate (P837): 69.9999999357021 percent)
Property / co-financing rate
69.9999999357021 percent
Amount69.9999999357021 percent
Unitpercent
 
Property / co-financing rate: 69.9999999357021 percent / rank
Normal rank
 

Revision as of 18:52, 19 March 2020

Project in Czech Republic financed by DG Regio
Language Label Description Also known as
English
5.1b Reduction of the energy performance of the building — Netoice Institute
Project in Czech Republic financed by DG Regio

    Statements

    0 references
    1,088,682.86 Czech koruna
    0 references
    43,547.3144 Euro
    10 January 2020
    0 references
    1,555,261.23 Czech koruna
    0 references
    62,210.4492 Euro
    10 January 2020
    0 references
    30 May 2019
    0 references
    31 December 2020
    0 references
    Město Netolice
    0 references
    0 references

    49°2'46.54"N, 14°11'53.66"E
    0 references
    38411
    0 references
    V rámci projektu dojde k instalaci nuceného větrání s rekuperací. Vzduchotechnická zařízení se zpětným ziskem tepla zajistí trvale vyhovující parametry vnitřního prostředí v učebnách a hudebním sále a povedou ke snížení tepelných ztrát větráním, tedy k celkovému snížení energetické náročnosti budovy. Jedná se o komplexní projekt ke snížení energetické náročnosti budovy kombinovaný ve dvou žádostech. (Czech)
    0 references
    As part of the project, a forced ventilation system will be installed with recovery. A hot return device shall ensure permanently satisfactory parameters of the internal environment in the classroom and in the musical room and lead to a reduction in heat loss by ventilation, i.e. to the overall reduction of the energy performance of the building. This is a comprehensive project to reduce the energy performance of the building combined in two applications. (English)
    0 references

    Identifiers

    CZ.05.5.18/0.0/0.0/17_070/0006513
    0 references