ZŠ Constitutional, Bendovka Object, Prague 8 — Reduction of the energy intensity of the object (Q72036): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The project addresses the improvement of the thermal technical properties of the Building Primary School, Bendovka Building — On Bendovce No 186/20 (parc.255) at the Prague 8 Ministry of Prague, the opening of the building envelope (485.9 m²), the roof of the soil (400.6 m²), the opening of the ceiling in the cellar (190 m²), the replacement of openings on the north side (30.5 m²) and the installation of air equipment. There will be energy savin...) |
(Changed an Item) |
||
Property / programme | |||
Property / programme: Environment - CZ - ERDF/CF / rank | |||
Normal rank |
Revision as of 17:31, 25 March 2020
Project in Czech Republic financed by DG Regio
Language | Label | Description | Also known as |
---|---|---|---|
English | ZŠ Constitutional, Bendovka Object, Prague 8 — Reduction of the energy intensity of the object |
Project in Czech Republic financed by DG Regio |
Statements
1,292,324.8 Czech koruna
0 references
3,230,812.0 Czech koruna
0 references
40 percent
0 references
28 May 2019
0 references
29 August 2017
0 references
Servisní středisko pro správu svěřeného majetku MČ Praha 8
0 references
18000
0 references
Projekt řeší zlepšení tepelně technických vlastností objektu ZŠ Ústavní, objekt Bendovka - Na Bendovce č.p. 186/20 (parc.č. 255) v MČ Praha 8, a to zateplením obvodového pláště (485,9 m2), střechy půdy (400,6 m2), zateplením stropu ve sklepních prostorech (190 m2), výměnou výplní otvorů na severní straně (30,5 m2) a instalací vzduchotechniky. Dojde k úsporám energie na vytápění a ke zlepšení vnitřního mikroklimatu budovy. Po realizaci projektu se budova zařadí do kategorie C - VYHOVUJÍCÍ. (Czech)
0 references
The project addresses the improvement of the thermal technical properties of the Building Primary School, Bendovka Building — On Bendovce No 186/20 (parc.255) at the Prague 8 Ministry of Prague, the opening of the building envelope (485.9 m²), the roof of the soil (400.6 m²), the opening of the ceiling in the cellar (190 m²), the replacement of openings on the north side (30.5 m²) and the installation of air equipment. There will be energy savings on heating and the improvement of the indoor climate of the building. After the implementation of the project, the building will be classified in category C — OFF. (English)
0 references
Identifiers
CZ.05.5.18/0.0/0.0/15_019/0001545
0 references