Elaboration of Feasibility Study and Technical Execution Project for the realisation of 9 road nodes on motorways A1, A2, A3 (Q3095686): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item)
Property / beneficiary
 
Property / beneficiary: Compania Națională de Administrare a Infrastructurii Rutiere / rank
 
Normal rank

Revision as of 19:02, 6 October 2021

Project Q3095686 in Romania
Language Label Description Also known as
English
Elaboration of Feasibility Study and Technical Execution Project for the realisation of 9 road nodes on motorways A1, A2, A3
Project Q3095686 in Romania

    Statements

    0 references
    0 references
    0 references
    0 references
    0 references
    0 references
    3,194,819.44 Romanian Leu
    0 references
    638,963.888 Euro
    13 September 2021
    0 references
    3,758,611.1 Romanian Leu
    0 references
    751,722.2200000001 Euro
    13 September 2021
    0 references
    85.0 percent
    0 references
    31 December 2020
    0 references
    31 December 2022
    0 references
    COMPANIA NAŢIONALĂ DE ADMINISTRARE A INFRASTRUCTURII RUTIERE S.A./Departament Documentatii Obtinere Fonduri Externe
    0 references
    0 references

    45°50'12.44"N, 21°57'33.77"E
    0 references

    44°26'18.56"N, 27°9'53.50"E
    0 references

    44°27'35.96"N, 26°8'0.06"E
    0 references

    44°33'40.46"N, 25°56'32.68"E
    0 references

    45°59'29.87"N, 21°20'45.60"E
    0 references
    Avand in vedere ca transporturile reprezinta motorul economiei, la nivel national si european, se doreste sustinerea unei dezvoltari economice sustenabile plecand de la asigurarea unei infrastructuri corespunzatoare. Obiectivul general al proiectului este imbunatatirea competitivitatii economice a României prin dezvoltarea infrastructurii de transport care faciliteaza integrarea economica in UE, contribuind astfel la dezvoltarea pietii interne cu scopul de a creea conditiile pentru cresterea volumului investitiilor, promovarea transportului durabil si a coeziunii in reteaua de drumuri europene. Prezentul proiect are in vedere elaborarea Studiului de Fezabilitate si a Proiectului Tehnic de Executie pentru 2 pachete de cate 6, respectiv 3 noduri rutiere pe Autostrazile A1, A2, A3, dupa cum urmeaza:  Pachet nr. 1 - Elaborare Studiu de Fezabilitate si Proiect Tehnic de Executie privind realizarea a 6 noduri rutiere pe Autostrazile A1 si A3 , in zona de Vest a Romaniei: • Nod rutier: A1 (km 326+155)-DJ704 (Cugir) • Nod rutier: A1 (km 362+813) - DC129 (Santuhalm) • Nod rutier: A1 (km 485+030_ - DJ609 E (Recas) • Nod rutier: A1 (km km 450+210) - DJ 609 (Bethausen) • Nod rutier: A1 (km 528+509) - DJ 682G (Cruceni) • Nod rutier: A3 (km 39+940) - DN 1P (Spinus).  Pachet nr. 2 - Elaborare Studiu de Fezabilitate si Proiect Tehnic de Executie privind realizarea a 3 noduri rutiere pe Autostrazile A1, A2, A3, in zona de Sud–Est a Romaniei: • Nod rutier Autostrada A1 km 73+100 cu DJ 702F la Ionesti • Nod rutier Autostrada A2 km 90+100 cu DJ 306 si DN3A la Dragos Voda • Nod rutier Autostrrada A3 km 36+700 cu DJ 101C la Gruiu (Sector Bucuresti - Ploiesti). Realizarea prezentului proiect - faza Elaborare Studiu de Fezabilitate si Proiect Tehnic de Executie pentru realizarea a 9 noduri rutiere pe Autostrazile A1, A2, A3 contribuie la indicatorul de rezultat 2S81 – Cerere de finanțare transmisă, spre analiză și aprobare la AM POIM / Organismul Intermediar pentru Transport. (Romanian)
    0 references
    Given that transport is the engine of the economy, at national and European level, it is desirable to support a sustainable economic development starting from the provision of proper infrastructure. The general objective of the project is to improve Romania’s economic competitiveness by developing transport infrastructure that facilitates economic integration in the EU, thus contributing to the development of the internal market in order to create the conditions for increasing the volume of investments, promoting sustainable transport and cohesion in the European road network. The present project envisages the elaboration of the Feasibility Study and the Technical Execution Project for 2 packages of 6 and 3 road nodes on motorways A1, A2, A3, as follows: Package no. 1 – Elaboration of Feasibility Study and Technical Execution Project regarding the realisation of 6 road nodes on motorways A1 and A3, in the western part of Romania: • Road node: A1 (km 326+ 155)-DJ704 (Cugir) • Road Node: A1 (km 362+ 813) – DC129 (Santuhalm) • Road Node: A1 (km 485+ 030_ – DJ609 E (Recas) • Road Node: A1 (km km 450+ 210) – DJ 609 (Bethausen) • Road Node: A1 (km 528+ 509) – DJ 682G (Cruceni) • Road Node: A3 (km 39+ 940) – DN 1P (Spinus). Package no. 2 – Elaboration of Feasibility Study and Technical Execution Project regarding the realisation of 3 road nodes on motorways A1, A2, A3, in the South-East area of Romania: • Road node Highway A1 km 73+ 100 with DJ 702F at Ionesti • Road Node Highway A2 km 90+ 100 with DJ 306 and DN3A at Dragos Voda • Road Node Autostrrada A3 km 36+ 700 with DJ 101C at Gruiu (Sector Bucharest – Ploiesti). Implementation of the present project – Phase Elaboration Feasibility Study and Technical Implementation Project for the realisation of 9 road nodes on motorways A1, A2, A3 contributes to the result indicator 2S81 – Application for funding submitted for analysis and approval to MA LIOP/Intermediate Body for Transport. (English)
    16 September 2021
    0 references
    Judeţul Ilfov, Romania
    0 references
    Oraş Recaş, Romania
    0 references
    Bethausen, Romania
    0 references
    Judeţul Hunedoara, Romania
    0 references
    Judeţul Arad, Romania
    0 references
    Oraş Găeşti, Romania
    0 references
    Dragoş Vodă, Romania
    0 references
    Municipiul Oradea, Romania
    0 references
    Oraş Cugir, Romania
    0 references

    Identifiers

    143412
    0 references