Reducing the energy intensity of buildings in the pre-school area M Grznára 1441 (Q3101610): Difference between revisions
Jump to navigation
Jump to search
(Created claim: summary (P836): The subject of the project is to reduce the energy intensity of the Maternity School Grznárova 1441.The construction is designed as four construction objekty:S.O.01 – Hospodárske pavilónS.O.02 – Pavilion “A”S.O.03 – Pavilion “B”S.O.04 – Pavilion “C”Restoration and reconstruction of the building is primarily aimed at reducing the energy intensity of the building. The scope of the reconstruction does not affect the original urban-architectural con...) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Réduction de l’intensité énergétique des bâtiments dans le domaine de l’éducation préscolaire — Grznára 1441 |
Revision as of 13:13, 27 November 2021
Project Q3101610 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reducing the energy intensity of buildings in the pre-school area M Grznára 1441 |
Project Q3101610 in Slovakia |
Statements
394,992.21 Euro
0 references
464,696.72 Euro
0 references
85.0 percent
0 references
1 August 2016
0 references
1 August 2020
0 references
Mesto Považská Bystrica
0 references
Q3120055 (Deleted Item)
0 references
Predmetom projektu je zníženie energetickej náročnosti Materskej školy Grznárova 1441.Stavba je riešená ako štyri stavebné objekty:S.O.01 – Hospodársky pavilónS.O.02 – Pavilón „A“S.O.03 – Pavilón „B“S.O.04 – Pavilón „C“Obnova a rekonštrukcia objektu je prioritne zameraná na znižovanie energetickej náročnosti budovy. Rozsah rekonštrukcie neovplyvňuje pôvodnú urbanisticko-architektonickú koncepciu objektu. (Slovak)
0 references
The subject of the project is to reduce the energy intensity of the Maternity School Grznárova 1441.The construction is designed as four construction objekty:S.O.01 – Hospodárske pavilónS.O.02 – Pavilion “A”S.O.03 – Pavilion “B”S.O.04 – Pavilion “C”Restoration and reconstruction of the building is primarily aimed at reducing the energy intensity of the building. The scope of the reconstruction does not affect the original urban-architectural concept of the building. (English)
28 September 2021
0 references
Identifiers
310041H165
0 references