Svidník – Ministry of Education of General Svoboda – insulation (Q3108033): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Changing beneficiary name in Slovakian projects) |
(Created claim: summary (P836): Objectives of the project: Reducing the energy intensity of buildings, reducing heating and lighting costs, improving the quality of packaging structures and indoor thermal comfort. The main activity of the project is to reduce the energy intensity of the public building of the MŠ on the Ul. General Svoboda, Svidník to the level of the low-energy building. Implemented measures will be the replacement of open structures, insulation of the outer s...) |
||||||||||||||
Property / summary | |||||||||||||||
Objectives of the project: Reducing the energy intensity of buildings, reducing heating and lighting costs, improving the quality of packaging structures and indoor thermal comfort. The main activity of the project is to reduce the energy intensity of the public building of the MŠ on the Ul. General Svoboda, Svidník to the level of the low-energy building. Implemented measures will be the replacement of open structures, insulation of the outer shell, roof insulation, measurement, control and control of energy consumption, replacement of light sources, installation of photovoltaic system.Place of implementation: The building of the kindergarten and children’s crèches is located in the built-up part of the town of Svidník na ul. General Svoboda.Measurable indicators of the project: Amount of e. energy produced by the RES plant (2.20 MWh/year), estimated annual greenhouse gas emission reductions (55.0687 t eqiv. CO2), Floor area of the renovated building (2410,44 m²), Energy consumption in the building after implementation (88,36 MWh/year), Energy consumption in the building before implementation (228,38 MWh/year), Reduction of final energy consumption (140027.26 kWh/year), Reduction of energy demand (220841.05 kWh/year), NOx emission reduction (0,0146 t/year), PM10 (0,0036 t/year), SO2 0,0045 t/year), Reduction of annual primary energy consumption (372702.23 kWh/year), Increased electricity generation capacity from renewable sources (0,0046 MWe), Increased RES power generation capacity (0,0046 MW). (English) | |||||||||||||||
Property / summary: Objectives of the project: Reducing the energy intensity of buildings, reducing heating and lighting costs, improving the quality of packaging structures and indoor thermal comfort. The main activity of the project is to reduce the energy intensity of the public building of the MŠ on the Ul. General Svoboda, Svidník to the level of the low-energy building. Implemented measures will be the replacement of open structures, insulation of the outer shell, roof insulation, measurement, control and control of energy consumption, replacement of light sources, installation of photovoltaic system.Place of implementation: The building of the kindergarten and children’s crèches is located in the built-up part of the town of Svidník na ul. General Svoboda.Measurable indicators of the project: Amount of e. energy produced by the RES plant (2.20 MWh/year), estimated annual greenhouse gas emission reductions (55.0687 t eqiv. CO2), Floor area of the renovated building (2410,44 m²), Energy consumption in the building after implementation (88,36 MWh/year), Energy consumption in the building before implementation (228,38 MWh/year), Reduction of final energy consumption (140027.26 kWh/year), Reduction of energy demand (220841.05 kWh/year), NOx emission reduction (0,0146 t/year), PM10 (0,0036 t/year), SO2 0,0045 t/year), Reduction of annual primary energy consumption (372702.23 kWh/year), Increased electricity generation capacity from renewable sources (0,0046 MWe), Increased RES power generation capacity (0,0046 MW). (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Objectives of the project: Reducing the energy intensity of buildings, reducing heating and lighting costs, improving the quality of packaging structures and indoor thermal comfort. The main activity of the project is to reduce the energy intensity of the public building of the MŠ on the Ul. General Svoboda, Svidník to the level of the low-energy building. Implemented measures will be the replacement of open structures, insulation of the outer shell, roof insulation, measurement, control and control of energy consumption, replacement of light sources, installation of photovoltaic system.Place of implementation: The building of the kindergarten and children’s crèches is located in the built-up part of the town of Svidník na ul. General Svoboda.Measurable indicators of the project: Amount of e. energy produced by the RES plant (2.20 MWh/year), estimated annual greenhouse gas emission reductions (55.0687 t eqiv. CO2), Floor area of the renovated building (2410,44 m²), Energy consumption in the building after implementation (88,36 MWh/year), Energy consumption in the building before implementation (228,38 MWh/year), Reduction of final energy consumption (140027.26 kWh/year), Reduction of energy demand (220841.05 kWh/year), NOx emission reduction (0,0146 t/year), PM10 (0,0036 t/year), SO2 0,0045 t/year), Reduction of annual primary energy consumption (372702.23 kWh/year), Increased electricity generation capacity from renewable sources (0,0046 MWe), Increased RES power generation capacity (0,0046 MW). (English) / qualifier | |||||||||||||||
point in time: 28 September 2021
|
Revision as of 14:43, 28 September 2021
Project Q3108033 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Svidník – Ministry of Education of General Svoboda – insulation |
Project Q3108033 in Slovakia |
Statements
429,317.8 Euro
0 references
505,079.77 Euro
0 references
85.0 percent
0 references
3 January 2018
0 references
2 January 2019
0 references
Mesto Svidník
0 references
Ciele projektu: Zníženie energetickej náročnosti objektov, zníženie nákladov na vykurovanie a osvetlenie, zlepšenie kvality obalových konštrukcií a vnútornej tepelnej pohody. Hlavnou aktivitou projektu je Zníženie energetickej náročnosti verejnej budovy MŠ na Ul. generála Svobodu, Svidník na úroveň nízkoenergetickej budovy. Realizovanými opatreniami bude výmena otvorových konštrukcií, zateplenie obvodového plášťa, zateplenie strechy, meranie, riadenie a regulácia spotreby energie, výmena svetelných zdrojov, inštalácia fotovoltaického systému.Miesto realizácie: Objekt Materskej školy a detských jaslí sa nachádza v zastavanej časti mesta Svidník na ul. Generála Svobodu.Merateľné ukazovatele projektu: Množstvo e. energie vyrobenej v zariadení OZE (2,20 MWh/rok), odhadované ročné zníženie emisií skleníkových plynov (55,0687 t ekviv. CO2), Podlahová plocha obnovenej budovy (2410,44 m2), Spotreba energie v budove po realizácii (88,36 MWh/rok), Spotreba energie v budove pred realizáciou (228,38 MWh/rok), Zníženie konečnej spotreby energie (140027,26 kWh/rok), Zníženie potreby energie (220841,05 kWh/rok), Zníženie produkcie emisií NOx (0,0146 t/rok), PM10 (0,0036 t/rok), SO2 0,0045 t/rok), Zníženie ročnej spotreby primárnej energie (372702,23 kWh/rok), Zvýšená kapacita výroby elektriny z obnoviteľných zdrojov (0,0046 MWe), Zvýšená kapacita výroby energie z OZE (0,0046MW). (Slovak)
0 references
Objectives of the project: Reducing the energy intensity of buildings, reducing heating and lighting costs, improving the quality of packaging structures and indoor thermal comfort. The main activity of the project is to reduce the energy intensity of the public building of the MŠ on the Ul. General Svoboda, Svidník to the level of the low-energy building. Implemented measures will be the replacement of open structures, insulation of the outer shell, roof insulation, measurement, control and control of energy consumption, replacement of light sources, installation of photovoltaic system.Place of implementation: The building of the kindergarten and children’s crèches is located in the built-up part of the town of Svidník na ul. General Svoboda.Measurable indicators of the project: Amount of e. energy produced by the RES plant (2.20 MWh/year), estimated annual greenhouse gas emission reductions (55.0687 t eqiv. CO2), Floor area of the renovated building (2410,44 m²), Energy consumption in the building after implementation (88,36 MWh/year), Energy consumption in the building before implementation (228,38 MWh/year), Reduction of final energy consumption (140027.26 kWh/year), Reduction of energy demand (220841.05 kWh/year), NOx emission reduction (0,0146 t/year), PM10 (0,0036 t/year), SO2 0,0045 t/year), Reduction of annual primary energy consumption (372702.23 kWh/year), Increased electricity generation capacity from renewable sources (0,0046 MWe), Increased RES power generation capacity (0,0046 MW). (English)
28 September 2021
0 references
Identifiers
310041A157
0 references