Cycle route V9 from Vlčiniec to Water Works – I. section (Q3107673): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 0.85 percent)
(‎Changed an Item: modifying co-finance rate with the percentage)
Property / co-financing rate
 
85.0 percent
Amount85.0 percent
Unitpercent
Property / co-financing rate: 85.0 percent / rank
 
Normal rank

Revision as of 14:18, 27 September 2021

Project Q3107673 in Slovakia
Language Label Description Also known as
English
Cycle route V9 from Vlčiniec to Water Works – I. section
Project Q3107673 in Slovakia

    Statements

    0 references
    152,629.09 Euro
    0 references
    179,563.63 Euro
    0 references
    85.0 percent
    0 references
    8 January 2021
    0 references
    4 January 2022
    0 references
    Mesto Žilina
    0 references
    Q3121931 (Deleted Item)
    0 references

    49°12'23.87"N, 18°46'19.88"E
    0 references
    Predmetom realizácie projektu je vybudovanie cyklotrasy V9, úsek I. v meste Žilina. Cyklochodník bude spájať sídlisko Vlčince smerom k Vodnému dielu Žilina, ako najvýznamnejšiemu vonkajšiemu rekreačnému priestranstvu v blízkosti mesta.Prostredníctvom realizácie projektu dôjde k vytvoreniu 0,505 km cyklistických chodníkov a v meste Žilina, čím dôjde k rozšíreniu celkovej siete cyklistických trás v meste. Chodníky budú vytvorené prostredníctvom výstavby samostatného oddeleného chodníka, veúceho prevažne popri hlavnej cestnej komunikácii.   Projekt bude realizovaný jednou hlavnou aktivitou s názvom Cyklistické komunikáce. Predpokladaný harmonogram realizácie je nastavený na 10 mesiacov, od 04/2021 – 12/2021.  Cieľom projektu je Podpora cyklistickej dopravy a zvýšenie podielu cyklistickej dopravy na celkovom počte prepravených osôb a celkovej atraktivity cyklistickej a nemotorovej prepravy v meste Žilina,  Vďaka výstavbe cyklochodníka dôjde k segregácií cyklistov z cestných komunikácií a chodníkov na samostatnú cestičku. Zvýši sa ich bezpečnosť v premávke a vytvoria sa podmienky pre zvýšenie kapacity cyklistickej prepravy na cestovanie do zamestnania v meste Žilina, respektíve cyklistickej prepravy k centrám občianskeho záujmu a občianskej infraštruktúry.Prostredníctvom predkladaného projektu dosiahneme nasledovné výsledky:Zlepšíme prepojenosť k miestam občianskej štruktúry a prepojenosť na uzly hospodárskeho významuZvýšime podiel cyklistickej prepravy na celkovom počte prepravených osôbZlepšenie prepojenia na terminály verejnej osobnej dopravy (zástavka MHD) a vytvoríme kvalitnejšie podmienky pre nárast využívania nízkohlukovej, nízko uhlíkovej a ekologicky priaznivej prepravyZnížime podiel osobnej automobilovej dopravy na prepravu do zamestnania a k centrám občianskej infraštruktúryOddelením cyklistickej prepravy z hlavných dopravných ťahov zvýšime bezpečnosť najzraniteľnejších účastníkov cestnej premávkyDobudovaním základnej siete cyklistickej infraštruktúry sa pripravíme priestor na nadväzujúce investičné projekty, prostredníctvom ktorých budeme naďalej rozvíjať možnosti cyklistickej prepravy v mestách a blízkom regióneNa projekt plánujeme nadviazať ďalšími aktivitami a etapami, prostredníctvom ktorých chceme dosiahnuť ďalší rozvoj cyklistickej infraštruktúry v meste Žilina. Projekt je pripravený komplexne a dokáže dosiahnuť všetky ciele a ukazovatele, ktoré sa zaväzuje splniť.Projekt je v súlade s viacerými strategickými dokumentmi cyklistickej a nemotorovej dopravy na mestskej, regionálnej a národnej úrovni. (Slovak)
    0 references
    The subject of the project is the construction of the cycle path V9, section I. in the city of Žilina. The cycle path will connect the Vlčince settlement towards the Žilina Water Work as the most important outdoor recreation area near the city. Through the implementation of the project, 0.505 km of cycling paths and in the city of Žilina will be created, thus extending the overall network of cycling routes in the city. The paths will be created through the construction of a separate separate path, mainly along the main road.   The project will be implemented by one main activity called Cycling Communications. The expected implementation schedule is set for 10 months, from 04/2021-12/2021.  The aim of the project is to support cycling transport and increase the share of cycling transport in the total number of passengers transported and the overall attractiveness of cycling and non-motorised transport in the city of Žilina. Thanks to the construction of the cycle path, there will be segregation of cyclists from road roads and paths to a separate path. We will improve their safety in traffic and create conditions for increasing cycling capacity to travel to employment in the city of Žilina, or cycling to centres of civic interest and civil infrastructure. Through this project we will achieve the following výsledky:Zlepšíme connectivity to civil structure locations and connectivity to hubs of economic importanceWe will increase the share of cycling in the total number of persons transportedImprove the connection to public passenger transport terminals (public transport stop) and we will develop better conditions for increasing the use of low-noise, low carbon and environmentally-friendly transport in the region through the development of infrastructure through which we will continue to develop the infrastructure through which we will continue to develop the road infrastructure through which we will continue to develop the infrastructure through which we will continue to develop the road infrastructure through which we will continue to develop the transport infrastructure through the road network. The project is prepared comprehensively and is able to achieve all the objectives and indicators it commits to achieving.The project is in line with several strategic documents of cycling and non-motor transport at urban, regional and national level. (English)
    15 September 2021
    0 references

    Identifiers

    302011AJR8
    0 references