ID R007 II/552 Košice – Veľké Kapušany – UA border – region Lower Zemplín (Q3106793): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Changing beneficiary name in Slovakian projects)
(‎Created claim: summary (P836): The project deals with the construction of road II/552 in the districts of Trebišov and Michalovce in the region of Dolný Zemplín as an important link of the villages in the south of the region with the district towns in continuation to the east of the Republic to the border with Ukraine and in the opposite direction to the regional town of Košice. The construction of the road is the main activity of the project. The aim of the proposed construc...)
Property / summary
 
The project deals with the construction of road II/552 in the districts of Trebišov and Michalovce in the region of Dolný Zemplín as an important link of the villages in the south of the region with the district towns in continuation to the east of the Republic to the border with Ukraine and in the opposite direction to the regional town of Košice. The construction of the road is the main activity of the project. The aim of the proposed construction modification is to increase the safety of road traffic, increase road traffic flow, increase the traffic comfort of road users and extend the life of the building objects concerned. Traffic times on the road will be shortened, the cost of normal maintenance of roads is minimised, noise levels and vehicle emissions will be reduced, and conditions for public transport by road within the public passenger transport system will be improved. The target group is the users of the road transport network, in particular residents of the municipalities of the Lower Zemplín region, operators and investors in industrial zones and public bus operators. The measurable indicator is the total length of Class II reconstructed or renovated roads with a value of 58,303 km. The project will contribute to a more balanced territorial development and increase the inner potential of the region for economic growth.The project directly follows on from another separate road reconstruction project II/552 region Abov, which is also submitted in this round of call. (English)
Property / summary: The project deals with the construction of road II/552 in the districts of Trebišov and Michalovce in the region of Dolný Zemplín as an important link of the villages in the south of the region with the district towns in continuation to the east of the Republic to the border with Ukraine and in the opposite direction to the regional town of Košice. The construction of the road is the main activity of the project. The aim of the proposed construction modification is to increase the safety of road traffic, increase road traffic flow, increase the traffic comfort of road users and extend the life of the building objects concerned. Traffic times on the road will be shortened, the cost of normal maintenance of roads is minimised, noise levels and vehicle emissions will be reduced, and conditions for public transport by road within the public passenger transport system will be improved. The target group is the users of the road transport network, in particular residents of the municipalities of the Lower Zemplín region, operators and investors in industrial zones and public bus operators. The measurable indicator is the total length of Class II reconstructed or renovated roads with a value of 58,303 km. The project will contribute to a more balanced territorial development and increase the inner potential of the region for economic growth.The project directly follows on from another separate road reconstruction project II/552 region Abov, which is also submitted in this round of call. (English) / rank
 
Normal rank
Property / summary: The project deals with the construction of road II/552 in the districts of Trebišov and Michalovce in the region of Dolný Zemplín as an important link of the villages in the south of the region with the district towns in continuation to the east of the Republic to the border with Ukraine and in the opposite direction to the regional town of Košice. The construction of the road is the main activity of the project. The aim of the proposed construction modification is to increase the safety of road traffic, increase road traffic flow, increase the traffic comfort of road users and extend the life of the building objects concerned. Traffic times on the road will be shortened, the cost of normal maintenance of roads is minimised, noise levels and vehicle emissions will be reduced, and conditions for public transport by road within the public passenger transport system will be improved. The target group is the users of the road transport network, in particular residents of the municipalities of the Lower Zemplín region, operators and investors in industrial zones and public bus operators. The measurable indicator is the total length of Class II reconstructed or renovated roads with a value of 58,303 km. The project will contribute to a more balanced territorial development and increase the inner potential of the region for economic growth.The project directly follows on from another separate road reconstruction project II/552 region Abov, which is also submitted in this round of call. (English) / qualifier
 
point in time: 28 September 2021
Timestamp+2021-09-28T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:34, 28 September 2021

Project Q3106793 in Slovakia
Language Label Description Also known as
English
ID R007 II/552 Košice – Veľké Kapušany – UA border – region Lower Zemplín
Project Q3106793 in Slovakia

    Statements

    0 references
    4,436,245.48 Euro
    0 references
    5,219,112.33 Euro
    0 references
    85.0 percent
    0 references
    4 January 2021
    0 references
    3 January 2023
    0 references
    Košický samosprávny kraj
    0 references
    0 references

    48°43'20.53"N, 21°15'25.20"E
    0 references
    Projekt rieši stavebnú úpravu cesty II/552 v okresoch Trebišov a Michalovce v regióne Dolný Zemplín ako významnej spojnice obcí na juhu kraja s okresnými mestami v pokračovaní na východ republiky na hranicu s Ukrajinou a v opačnom smere s krajským mestom Košice. Stavebná úprava cesty je hlavnou aktivitou projektu. V rámci nej ide o zosilnenie vozovky, stabilizáciu cestného telesa, úpravu krajníc, úpravu 17 existujćich autobusových zastávok v oboch smeroch a výstavbu nástupíšť, aplikáciu bezpečnostných prvkov – osadenie oceľových zvodidiel, blikačov na priechode pre chodcov, dopravného značenia a informačných systémov – 2 meteostanice.Cieľom navrhovanej stavebnej úpravy je zvýšenie bezpečnosti a plynulosti cestnej premávky, zvýšenie dopravného komfortu užívateľov komunikácie a predĺženie životnosti dotknutých stavebných objektov. Skráti sa doba premávky na cestnej komunikácii, minimalizujú sa náklady na bežnú údržbu ciest, zníži sa hladina hluku a emisií od vozidiel a zlepšia sa podmienky pre cestnú hromadnú dopravu v rámci systému verejnej osobnej dopravy. Cieľovú skupinu predstavujú užívatelia cestnej dopravnej siete, najmä obyvatelia obcí regiónu Dolný Zemplín, prevádzkovatelia a investori v priemyselných zónach a prevádzkovatelia verejnej autobusovej dopravy. Merateľným ukazovateľom je celková dĺžka rekonštruovaných alebo zrenovovaných ciest II. triedy s hodnotou 58,303 km. Projekt prispeje k vyváženejšiemu územnému rozvoju a zvýšeniu vnútorného potenciálu kraja pre hospodársky rast.Projekt priamo nadväzuje na ďalší samostatný projekt rekonštrukcie cesty II/552 región Abov, ktorý je taktiež podaný v tomto kole výzvy. (Slovak)
    0 references
    The project deals with the construction of road II/552 in the districts of Trebišov and Michalovce in the region of Dolný Zemplín as an important link of the villages in the south of the region with the district towns in continuation to the east of the Republic to the border with Ukraine and in the opposite direction to the regional town of Košice. The construction of the road is the main activity of the project. The aim of the proposed construction modification is to increase the safety of road traffic, increase road traffic flow, increase the traffic comfort of road users and extend the life of the building objects concerned. Traffic times on the road will be shortened, the cost of normal maintenance of roads is minimised, noise levels and vehicle emissions will be reduced, and conditions for public transport by road within the public passenger transport system will be improved. The target group is the users of the road transport network, in particular residents of the municipalities of the Lower Zemplín region, operators and investors in industrial zones and public bus operators. The measurable indicator is the total length of Class II reconstructed or renovated roads with a value of 58,303 km. The project will contribute to a more balanced territorial development and increase the inner potential of the region for economic growth.The project directly follows on from another separate road reconstruction project II/552 region Abov, which is also submitted in this round of call. (English)
    28 September 2021
    0 references

    Identifiers

    302011AFR9
    0 references