Promoting access to drinking water in the municipality Salt – construction and extension of local water supply – Location L3 (Q3106782): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Changing beneficiary name in Slovakian projects)
(‎Created claim: summary (P836): The present project aims to improve the quality of life of the population of the marginalised Roma community by promoting access to drinking water. The main objective of the project is the construction and expansion of local water supply systems, including all technologies, construction works and buildings in the environment of the newly created L3 site, which is a continuation of the current MRK of the village Salt. Based on the demographic dev...)
Property / summary
 
The present project aims to improve the quality of life of the population of the marginalised Roma community by promoting access to drinking water. The main objective of the project is the construction and expansion of local water supply systems, including all technologies, construction works and buildings in the environment of the newly created L3 site, which is a continuation of the current MRK of the village Salt. Based on the demographic development of the municipality, the population is constantly increasing and the demand for housing is growing. As Roma dwellings are overcrowded and the current capacity of rental apartments is insufficient, the municipality has allocated in 2018 a new area for individual housing, rental and lower standard flats, the so-called L3 site, the construction of which will take place in three stages. Within the first stage, a new street is currently being created in the L3 area, which will be built by 15 family houses. The municipality wants to ensure access to drinking water for the inhabitants of the newly created site by extending the water supply network and connecting it to the existing public distribution of water supply. The extension of the water supply network with distribution pipes is proposed in the length of 219.5 m. Part of the extension of the water supply network is 15 turns leading to home connections to the boundaries of land with a total length of 45 m and 2 turn of the total length of 20 m to the rental apartments, the construction of which is planned within the second stage of the construction of the new L3 site. Due to the situation of the current separated Roma settlement, as well as the newly created site uphill, the proposed water supply pipeline fails to ensure sufficient pressure for drinking water supply, therefore the project also includes the construction of an automatic pressure station to increase the water pressure in the pipeline. At station from the point of view of the most suitable construction and technical solution will be located in the site of the current Roma settlement, it is not possible to place it in the L3 site. In the first phase of the construction of the new site, the municipality of Salt will provide access to drinking water for 50 inhabitants of the MRC by building and extending the water network, as well as access to water for 20 rental apartments, the construction of which is planned within the second stage. (English)
Property / summary: The present project aims to improve the quality of life of the population of the marginalised Roma community by promoting access to drinking water. The main objective of the project is the construction and expansion of local water supply systems, including all technologies, construction works and buildings in the environment of the newly created L3 site, which is a continuation of the current MRK of the village Salt. Based on the demographic development of the municipality, the population is constantly increasing and the demand for housing is growing. As Roma dwellings are overcrowded and the current capacity of rental apartments is insufficient, the municipality has allocated in 2018 a new area for individual housing, rental and lower standard flats, the so-called L3 site, the construction of which will take place in three stages. Within the first stage, a new street is currently being created in the L3 area, which will be built by 15 family houses. The municipality wants to ensure access to drinking water for the inhabitants of the newly created site by extending the water supply network and connecting it to the existing public distribution of water supply. The extension of the water supply network with distribution pipes is proposed in the length of 219.5 m. Part of the extension of the water supply network is 15 turns leading to home connections to the boundaries of land with a total length of 45 m and 2 turn of the total length of 20 m to the rental apartments, the construction of which is planned within the second stage of the construction of the new L3 site. Due to the situation of the current separated Roma settlement, as well as the newly created site uphill, the proposed water supply pipeline fails to ensure sufficient pressure for drinking water supply, therefore the project also includes the construction of an automatic pressure station to increase the water pressure in the pipeline. At station from the point of view of the most suitable construction and technical solution will be located in the site of the current Roma settlement, it is not possible to place it in the L3 site. In the first phase of the construction of the new site, the municipality of Salt will provide access to drinking water for 50 inhabitants of the MRC by building and extending the water network, as well as access to water for 20 rental apartments, the construction of which is planned within the second stage. (English) / rank
 
Normal rank
Property / summary: The present project aims to improve the quality of life of the population of the marginalised Roma community by promoting access to drinking water. The main objective of the project is the construction and expansion of local water supply systems, including all technologies, construction works and buildings in the environment of the newly created L3 site, which is a continuation of the current MRK of the village Salt. Based on the demographic development of the municipality, the population is constantly increasing and the demand for housing is growing. As Roma dwellings are overcrowded and the current capacity of rental apartments is insufficient, the municipality has allocated in 2018 a new area for individual housing, rental and lower standard flats, the so-called L3 site, the construction of which will take place in three stages. Within the first stage, a new street is currently being created in the L3 area, which will be built by 15 family houses. The municipality wants to ensure access to drinking water for the inhabitants of the newly created site by extending the water supply network and connecting it to the existing public distribution of water supply. The extension of the water supply network with distribution pipes is proposed in the length of 219.5 m. Part of the extension of the water supply network is 15 turns leading to home connections to the boundaries of land with a total length of 45 m and 2 turn of the total length of 20 m to the rental apartments, the construction of which is planned within the second stage of the construction of the new L3 site. Due to the situation of the current separated Roma settlement, as well as the newly created site uphill, the proposed water supply pipeline fails to ensure sufficient pressure for drinking water supply, therefore the project also includes the construction of an automatic pressure station to increase the water pressure in the pipeline. At station from the point of view of the most suitable construction and technical solution will be located in the site of the current Roma settlement, it is not possible to place it in the L3 site. In the first phase of the construction of the new site, the municipality of Salt will provide access to drinking water for 50 inhabitants of the MRC by building and extending the water network, as well as access to water for 20 rental apartments, the construction of which is planned within the second stage. (English) / qualifier
 
point in time: 28 September 2021
Timestamp+2021-09-28T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0

Revision as of 14:34, 28 September 2021

Project Q3106782 in Slovakia
Language Label Description Also known as
English
Promoting access to drinking water in the municipality Salt – construction and extension of local water supply – Location L3
Project Q3106782 in Slovakia

    Statements

    0 references
    66,745.88 Euro
    0 references
    78,524.57 Euro
    0 references
    85.0 percent
    0 references
    12 January 2020
    0 references
    2 January 2022
    0 references
    Obec Soľ
    0 references
    Q3123985 (Deleted Item)
    0 references

    48°55'36.26"N, 21°35'50.39"E
    0 references
    Predkladaný projekt je zameraný na zvýšenie kvality života obyvateľov marginalizovanej rómskej komunity prostredníctvom podpory prístupu k pitnej vode. Hlavným cieľom projektu je výstavba a rozšírenie miestnych vodovodov, vrátane všetkých technológii, stavebných prác a objektov v prostredí novovzniknutej lokality L3, ktorá je pokračovaním súčasnej MRK obce Soľ. Na základe demografického vývoja obce počet obyvateľov neustále narastá a rastie dopyt po bývaní. Keďže rómske obydlia sú preľudnené a súčasná kapacita nájomných bytov  je nepostačujúca, obec vyčlenila v územnom pláne v roku 2018 novú plochu na individuálnu bytovú výstavbu, výstavbu nájomných bytov a bytov nižšieho štandardu, tzv. Lokalita L3, ktorej výstavba bude prebiehať v troch etapách. V rámci prvej etapy aktuálne vzniká v lokalite L3 nová ulica, ktorá bude zastavaná 15-timi rodinným domami. Obec pre obyvateľov novovzniknutej lokality chce zabezpečiť prístup k pitnej vode rozšírením vodovodnej siete a jej napojením na existujúci verejný rozvod vodovodu. Rozšírenie vodovodnej siete o rozvodné potrubia je navrhované v dĺžke 219,5 m. Súčasťou rozšírenia vodovodnej siete je 15 odbočení vedúcich k domovým prípojkám po hranice pozemkov o celkovej dĺžke 45 m a 2 odbočenia o celkovej dĺžke 20 m k nájomným bytom, ktorých výstavba je plánovaná v rámci druhej etapy budovania novej lokality L3. Z dôvodu situovania súčasného separovaného rómskeho osídlenia, ako aj novovzniknutej lokality do kopca, navrhované vodovodné potrubie nedokáže zabezpečiť dostatočný tlak pre zásobovanie pitnou vodou, preto súčasťou projektu je aj vybudovanie automatickej tlakovej stanice pre zvýšenie tlaku vody v potrubí. AT stanica z pohľadu najvhodnejšieho stavebno-technického riešenia bude umiestnená v lokalite súčasného rómskeho osídlenia, nie je možné ju umiestniť v lokalite L3. Obec Soľ v rámci prvej etapy budovania novej lokality zabezpečí výstavbou a rozšírením vodovodnej siete prístup k pitnej vode pre 50 obyvateľov MRK a zároveň aj prístup k vode pre 20 nájomných bytov, ktorých výstavba je plánovaná v rámci druhej etapy. (Slovak)
    0 references
    The present project aims to improve the quality of life of the population of the marginalised Roma community by promoting access to drinking water. The main objective of the project is the construction and expansion of local water supply systems, including all technologies, construction works and buildings in the environment of the newly created L3 site, which is a continuation of the current MRK of the village Salt. Based on the demographic development of the municipality, the population is constantly increasing and the demand for housing is growing. As Roma dwellings are overcrowded and the current capacity of rental apartments is insufficient, the municipality has allocated in 2018 a new area for individual housing, rental and lower standard flats, the so-called L3 site, the construction of which will take place in three stages. Within the first stage, a new street is currently being created in the L3 area, which will be built by 15 family houses. The municipality wants to ensure access to drinking water for the inhabitants of the newly created site by extending the water supply network and connecting it to the existing public distribution of water supply. The extension of the water supply network with distribution pipes is proposed in the length of 219.5 m. Part of the extension of the water supply network is 15 turns leading to home connections to the boundaries of land with a total length of 45 m and 2 turn of the total length of 20 m to the rental apartments, the construction of which is planned within the second stage of the construction of the new L3 site. Due to the situation of the current separated Roma settlement, as well as the newly created site uphill, the proposed water supply pipeline fails to ensure sufficient pressure for drinking water supply, therefore the project also includes the construction of an automatic pressure station to increase the water pressure in the pipeline. At station from the point of view of the most suitable construction and technical solution will be located in the site of the current Roma settlement, it is not possible to place it in the L3 site. In the first phase of the construction of the new site, the municipality of Salt will provide access to drinking water for 50 inhabitants of the MRC by building and extending the water network, as well as access to water for 20 rental apartments, the construction of which is planned within the second stage. (English)
    28 September 2021
    0 references

    Identifiers

    312061APC2
    0 references