Agglomeration Nitrianske Pravno – sewerage and WWTP (Q3100616): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying co-finance rate with the percentage) |
(Created claim: summary (P836): Project “Aglomerácia Nitrianske Pravno – sewerage and WWTP” is designed in the village of Nitrianske Pravno, Prievidza district. There is currently no sewage disposal system in the village. Within the village are built only sections of rain sewerage. The absence of sewerage now and for the future threatens the state of surface and groundwater and thus significantly worsens the living conditions of the population. The aim of the project is to ens...) |
||||||||||||||
Property / summary | |||||||||||||||
Project “Aglomerácia Nitrianske Pravno – sewerage and WWTP” is designed in the village of Nitrianske Pravno, Prievidza district. There is currently no sewage disposal system in the village. Within the village are built only sections of rain sewerage. The absence of sewerage now and for the future threatens the state of surface and groundwater and thus significantly worsens the living conditions of the population. The aim of the project is to ensure the drainage and subsequent treatment of urban waste water from the Aglomeration and will be ensured through 2 main activities of the project: Construction of a new WWTP and construction of sewage sewerage.Drainage of the village is designed by gravitational sewage canlisation. Two petrol stations are designed to bridge the altitude differences, one of which is at the WWTP. The main objective of the project is to ensure safe drainage of sewage from the agglomeration and subsequent treatment in a newly built WWTP with a capacity of 3000 EO. The implementation of the project will build a sewer network of 11908,40 m to provide wastewater treatment in a new WWTP meeting the legislative conditions. (English) | |||||||||||||||
Property / summary: Project “Aglomerácia Nitrianske Pravno – sewerage and WWTP” is designed in the village of Nitrianske Pravno, Prievidza district. There is currently no sewage disposal system in the village. Within the village are built only sections of rain sewerage. The absence of sewerage now and for the future threatens the state of surface and groundwater and thus significantly worsens the living conditions of the population. The aim of the project is to ensure the drainage and subsequent treatment of urban waste water from the Aglomeration and will be ensured through 2 main activities of the project: Construction of a new WWTP and construction of sewage sewerage.Drainage of the village is designed by gravitational sewage canlisation. Two petrol stations are designed to bridge the altitude differences, one of which is at the WWTP. The main objective of the project is to ensure safe drainage of sewage from the agglomeration and subsequent treatment in a newly built WWTP with a capacity of 3000 EO. The implementation of the project will build a sewer network of 11908,40 m to provide wastewater treatment in a new WWTP meeting the legislative conditions. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: Project “Aglomerácia Nitrianske Pravno – sewerage and WWTP” is designed in the village of Nitrianske Pravno, Prievidza district. There is currently no sewage disposal system in the village. Within the village are built only sections of rain sewerage. The absence of sewerage now and for the future threatens the state of surface and groundwater and thus significantly worsens the living conditions of the population. The aim of the project is to ensure the drainage and subsequent treatment of urban waste water from the Aglomeration and will be ensured through 2 main activities of the project: Construction of a new WWTP and construction of sewage sewerage.Drainage of the village is designed by gravitational sewage canlisation. Two petrol stations are designed to bridge the altitude differences, one of which is at the WWTP. The main objective of the project is to ensure safe drainage of sewage from the agglomeration and subsequent treatment in a newly built WWTP with a capacity of 3000 EO. The implementation of the project will build a sewer network of 11908,40 m to provide wastewater treatment in a new WWTP meeting the legislative conditions. (English) / qualifier | |||||||||||||||
point in time: 28 September 2021
|
Revision as of 13:53, 28 September 2021
Project Q3100616 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Agglomeration Nitrianske Pravno – sewerage and WWTP |
Project Q3100616 in Slovakia |
Statements
5,604,512.5 Euro
0 references
6,593,544.12 Euro
0 references
85.0 percent
0 references
1 June 2017
0 references
1 July 2022
0 references
Stredoslovenská vodárenská spoločnosť, a.s.
0 references
Projekt „Aglomerácia Nitrianske Pravno – kanalizácia a ČOV“ je riešený v obci Nitrianske Pravno, okres Prievidza. V súčasnosti v obci nie je vybudovaný systém odvádzania splaškových odpadových vôd. V rámci obce sú vybudované len úseky dažďovej kanalizácie. Absencia kanalizácie v súčasnosti i pre budúcnosť ohrozuje stav povrchových i podzemných vôd a tým výrazne zhoršuje životné podmienky obyvateľstva. Cieľom projektu je zabezpečenie odvádzania a následného čistenia komunálnych odpadových vôd z Aglomerácie a bude zabezpečený prostredníctvom 2 hlavných aktivít projeku: Výstavba novej ČOV a Výstavba splaškovej kanalizácie.Odkanalizovanie obce je navrhnuté gravitačnou splaškovou kanlizáciou. Na preklenutie výškových terénnych rozdielov sú navrhnuté dve čerpacie stanice, jedna z nich je pri ČOV. ČOV je navrhnutá v extraviláne obce, z južnej strany.Hlavným cieľom projektu je zabezpečiť nezávadné odvádzanie splaškových odpadových vôd z aglomerácie a následné čistenie v novovybudovanej ČOV s kapacitou 3000 EO. Realizáciou projektu sa vybuduje stoková sieť v dĺžke 11 908,40 m zabezpečí čistenie odpadových vôd v novej ČOV spĺňajúce legislatívne podmienky. (Slovak)
0 references
Project “Aglomerácia Nitrianske Pravno – sewerage and WWTP” is designed in the village of Nitrianske Pravno, Prievidza district. There is currently no sewage disposal system in the village. Within the village are built only sections of rain sewerage. The absence of sewerage now and for the future threatens the state of surface and groundwater and thus significantly worsens the living conditions of the population. The aim of the project is to ensure the drainage and subsequent treatment of urban waste water from the Aglomeration and will be ensured through 2 main activities of the project: Construction of a new WWTP and construction of sewage sewerage.Drainage of the village is designed by gravitational sewage canlisation. Two petrol stations are designed to bridge the altitude differences, one of which is at the WWTP. The main objective of the project is to ensure safe drainage of sewage from the agglomeration and subsequent treatment in a newly built WWTP with a capacity of 3000 EO. The implementation of the project will build a sewer network of 11908,40 m to provide wastewater treatment in a new WWTP meeting the legislative conditions. (English)
28 September 2021
0 references
Identifiers
310011A111
0 references