Reconstruction of the national regional road P73 Vecumnieki – Nereta – Subate section km 57.56-65.10 (Q3057649): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: modifying co-finance rate with the percentage) |
(Changed label, description and/or aliases in fr: translated_label) |
||
label / fr | label / fr | ||
Reconstruction de la route nationale régionale P73 Vecumnieki — Nereta — Sous-section km 57,56-65.10 |
Revision as of 20:33, 25 November 2021
Project Q3057649 in Latvia
Language | Label | Description | Also known as |
---|---|---|---|
English | Reconstruction of the national regional road P73 Vecumnieki – Nereta – Subate section km 57.56-65.10 |
Project Q3057649 in Latvia |
Statements
6,194,466.27 Euro
0 references
7,287,607.38 Euro
0 references
85.0 percent
0 references
23 September 2016
0 references
22 December 2020
0 references
Satiksmes ministrija
0 references
Projekta mērķis ir valsts reģionālā autoceļa P73 Vecumnieki – Nereta – Subate posma km 57,56 – 65,10 pārbūve, kas ietver segas izbūvi un zemju iegādi. Plānotais kopējais projekta īstenošanas ilgums 51 mēneši. Projekta plānotās kopējās izmaksas 7 287 607,38 euro, t.sk. plānotais Eiropas Reģionālās attīstības fonda finansējums – 6 194 466,27 euro un valsts budžeta finansējums – 1 093 141,11 euro. Projekta īstenošanas rezultātā tiks sakārtots valsts reģionālā autoceļa P73 Vecumnieki – Nereta – Subate posma km 57,56 – 65,10 – 7,54 km garumā. Projektā ietvertā autoceļa posmu maksimālā autotransporta dzenošās ass slodze pēc projekta īstenošanas būs 11,5 tonnas un maksimālā nekontrolētā transportlīdzekļa pilnā masa būs 44 tonnas. Autoceļš atrodas valsts īpašumā. Nepieciešamības gadījumā vajadzīgie zemes gabali tiks iegādāti. (Latvian)
0 references
The aim of the project is reconstruction of the national regional road P73 Vecumnieki – Nereta – Subate km 57.56-65.10, which includes the construction of a duvet and the purchase of land. The total planned duration of the project is 51 months. The planned total cost of the project is EUR 7287607,38, including the planned European Regional Development Fund funding – EUR 6194466.27 and the state budget funding – EUR 1093141.11. As a result of the project, the national regional road P73 Vecumnieki – Nereta – Subate will be arranged in the length of 57.56-65.10-7.54 km. The maximum driven axle load of road sections covered by the project will be 11.5 tonnes after the implementation of the project and the maximum uncontrolled vehicle mass will be 44 tonnes. The road is state-owned. If necessary, the necessary plots will be purchased. (English)
15 July 2021
0 references
Neretas pag., Aizkraukles nov.
0 references
Neretas pag., Aizkraukles nov.
0 references
Neretas pag., Aizkraukles nov.
0 references
Identifiers
6.3.1.0/16/I/016
0 references