(Created claim: summary (P836): The aim of the project “Modernisation of road III. Class 1113 Rohožník-Malacky” is the reconstruction of road III/1113 Rohožník – Malacky, through IROP under priority axis No.1: Safe and clean transport in the regions. Road III/1113 Rohožník – Malacky with connection to the D2 motorway, which belongs to the TEN-T core network within the ORIENT/EAST-MED corridor, is a key road communication between the district town of Malacky and the surrounding...) |
||||||||||||||
Property / summary | |||||||||||||||
The aim of the project “Modernisation of road III. Class 1113 Rohožník-Malacky” is the reconstruction of road III/1113 Rohožník – Malacky, through IROP under priority axis No.1: Safe and clean transport in the regions. Road III/1113 Rohožník – Malacky with connection to the D2 motorway, which belongs to the TEN-T core network within the ORIENT/EAST-MED corridor, is a key road communication between the district town of Malacky and the surrounding municipalities. The road is the fastest transport connection to the district town for the villages Rohožník, Sološnica, Kuchyňa, Plavecké Podhradie and Plavecký Mikuláš, i.e. for approximately 8.5 thousand inhabitants of the affected municipalities. The road is also of trans-regional importance as it represents the fastest connection to the D2 motorway for the villages Plavecký Peter, Prievaly, Cerová, Buková, Osuské and Jablonica in the Trnava region. In addition to individual passenger transport, the road is also used by freight and public passenger transport. Due to the unsatisfactory width structure of road III/1113, in 2011, freight traffic of more than 12 tonnes in the direction of Rohožník-Malacky was unidirectional. The situation is solved by a detour through the villages Pernek and Kuchyňa, which negatively affects about 2600 inhabitants of the mentioned villages. Road III/1113 is a strategic connection to the rest of the road network for several production plants of companies operating in the area. The key task of road III/1113 Rohožník – Malacky is, in particular, to ensure a rapid connection to the TEN-T and direct entry to the European Union’s Internal Market. The reconstructed road III/1113 between Malacky and Rohožník is the most beneficial link between the municipalities concerned in the region with the district town of Malacky and with the D2 motorway in terms of time and distance and thus also in terms of environmental impact. The modernisation of road III/1113 will reduce the operational costs for its repair and maintenance. In terms of measurable indicators, the aim of the project is to reconstruct 7,787 km of road and gain time savings in road transport on road III/1113 Rohožník-Malacky worth EUR 20897 towards the end of the project implementation, and this value increases annually in terms of the CBA. (English) | |||||||||||||||
Property / summary: The aim of the project “Modernisation of road III. Class 1113 Rohožník-Malacky” is the reconstruction of road III/1113 Rohožník – Malacky, through IROP under priority axis No.1: Safe and clean transport in the regions. Road III/1113 Rohožník – Malacky with connection to the D2 motorway, which belongs to the TEN-T core network within the ORIENT/EAST-MED corridor, is a key road communication between the district town of Malacky and the surrounding municipalities. The road is the fastest transport connection to the district town for the villages Rohožník, Sološnica, Kuchyňa, Plavecké Podhradie and Plavecký Mikuláš, i.e. for approximately 8.5 thousand inhabitants of the affected municipalities. The road is also of trans-regional importance as it represents the fastest connection to the D2 motorway for the villages Plavecký Peter, Prievaly, Cerová, Buková, Osuské and Jablonica in the Trnava region. In addition to individual passenger transport, the road is also used by freight and public passenger transport. Due to the unsatisfactory width structure of road III/1113, in 2011, freight traffic of more than 12 tonnes in the direction of Rohožník-Malacky was unidirectional. The situation is solved by a detour through the villages Pernek and Kuchyňa, which negatively affects about 2600 inhabitants of the mentioned villages. Road III/1113 is a strategic connection to the rest of the road network for several production plants of companies operating in the area. The key task of road III/1113 Rohožník – Malacky is, in particular, to ensure a rapid connection to the TEN-T and direct entry to the European Union’s Internal Market. The reconstructed road III/1113 between Malacky and Rohožník is the most beneficial link between the municipalities concerned in the region with the district town of Malacky and with the D2 motorway in terms of time and distance and thus also in terms of environmental impact. The modernisation of road III/1113 will reduce the operational costs for its repair and maintenance. In terms of measurable indicators, the aim of the project is to reconstruct 7,787 km of road and gain time savings in road transport on road III/1113 Rohožník-Malacky worth EUR 20897 towards the end of the project implementation, and this value increases annually in terms of the CBA. (English) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: The aim of the project “Modernisation of road III. Class 1113 Rohožník-Malacky” is the reconstruction of road III/1113 Rohožník – Malacky, through IROP under priority axis No.1: Safe and clean transport in the regions. Road III/1113 Rohožník – Malacky with connection to the D2 motorway, which belongs to the TEN-T core network within the ORIENT/EAST-MED corridor, is a key road communication between the district town of Malacky and the surrounding municipalities. The road is the fastest transport connection to the district town for the villages Rohožník, Sološnica, Kuchyňa, Plavecké Podhradie and Plavecký Mikuláš, i.e. for approximately 8.5 thousand inhabitants of the affected municipalities. The road is also of trans-regional importance as it represents the fastest connection to the D2 motorway for the villages Plavecký Peter, Prievaly, Cerová, Buková, Osuské and Jablonica in the Trnava region. In addition to individual passenger transport, the road is also used by freight and public passenger transport. Due to the unsatisfactory width structure of road III/1113, in 2011, freight traffic of more than 12 tonnes in the direction of Rohožník-Malacky was unidirectional. The situation is solved by a detour through the villages Pernek and Kuchyňa, which negatively affects about 2600 inhabitants of the mentioned villages. Road III/1113 is a strategic connection to the rest of the road network for several production plants of companies operating in the area. The key task of road III/1113 Rohožník – Malacky is, in particular, to ensure a rapid connection to the TEN-T and direct entry to the European Union’s Internal Market. The reconstructed road III/1113 between Malacky and Rohožník is the most beneficial link between the municipalities concerned in the region with the district town of Malacky and with the D2 motorway in terms of time and distance and thus also in terms of environmental impact. The modernisation of road III/1113 will reduce the operational costs for its repair and maintenance. In terms of measurable indicators, the aim of the project is to reconstruct 7,787 km of road and gain time savings in road transport on road III/1113 Rohožník-Malacky worth EUR 20897 towards the end of the project implementation, and this value increases annually in terms of the CBA. (English) / qualifier | |||||||||||||||
point in time: 28 September 2021
|
Revision as of 13:54, 28 September 2021
Project Q3100759 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Modernisation of the road III. Class 1113 Horho ník – Malacky |
Project Q3100759 in Slovakia |
Statements
3,468,747.06 Euro
0 references
6,937,494.12 Euro
0 references
50.0 percent
0 references
1 July 2018
0 references
1 October 2019
0 references
Bratislavský samosprávny kraj
0 references
Cieľom projektu „Modernizácia cesty III. triedy 1113 Rohožník-Malacky" je rekonštrukcia cesty III/1113 Rohožník - Malacky, prostredníctvom IROP v rámci prioritnej osi č.1: Bezpečná a ekologická doprava v regiónoch. Cesta III/1113 Rohožník - Malacky s napojením na diaľnicu D2, ktorá patrí do hlavnej siete TEN-T v rámci koridoru ORIENT/EAST-MED, je kľúčovou cestnou komunikáciou medzi okresným mestom Malacky a okolitými obcami. Cesta predstavuje najrýchlejšie dopravné spojenie do okresného mesta pre obce Rohožník, Sološnica, Kuchyňa, Plavecké Podhradie a Plavecký Mikuláš, teda pre približne 8,5 tisíca obyvateľov dotknutých obcí. Cesta má navyše nadregionálny význam, nakoľko predstavuje najrýchlejšie napojenie na diaľnicu D2 pre obce Plavecký Peter, Prievaly, Cerová, Buková, Osuské a Jablonica v Trnavskom kraji. Okrem individuálnej osobnej dopravy je cesta využívaná aj nákladnou a verejnou osobnou dopravou. Z dôvodu nevyhovujúceho šírkového usporiadania cesty III/1113 sa v roku 2011 pristúpilo k zjednosmerneniu premávky nákladnej dopravy nad 12 ton v smere Rohožník-Malacky. Vzniknutá situácia je riešená obchádzkou cez obce Pernek a Kuchyňa,čo negatívne vplýva na približne 2600 obyvateľov spomínaných obcí. Cesta III/1113 je strategickým napojením na ostatnú cestnú sieť pre viaceré výrobné závody spoločností pôsobiacich v oblasti. Kľúčovou úlohou cesty III/1113 Rohožník – Malacky, je predovšetkým zabezpečenie rýchleho napojenia na TEN-T a priameho vstupu na Vnútorný trh Európskej únie. Zrekonštruovaná cesta III/1113 medzi Malackami a Rohožníkom predstavuje z hľadiska času a vzdialenosti a teda aj z hľadiska dopadu na životné prostredie najvýhodnejšie prepojenie dotknutých obcí v regióne s okresným mestom Malacky a s diaľnicou D2. Modernizáciou cesty III/1113 sa znížia prevádzkové náklady na jej opravu a údržbu. Z hľadiska merateľných ukazovateľov, je cieľom projektu zrekonštruovať 7,787 km cesty a získať úsporu času v cestnej doprave na ceste III/1113 Rohožník-Malacky v hodnote 20 897 EUR ku koncu realizácie projektu pričom táto hodnota v zmysle vypracovanej CBA každoročne narastá. (Slovak)
0 references
The aim of the project “Modernisation of road III. Class 1113 Rohožník-Malacky” is the reconstruction of road III/1113 Rohožník – Malacky, through IROP under priority axis No.1: Safe and clean transport in the regions. Road III/1113 Rohožník – Malacky with connection to the D2 motorway, which belongs to the TEN-T core network within the ORIENT/EAST-MED corridor, is a key road communication between the district town of Malacky and the surrounding municipalities. The road is the fastest transport connection to the district town for the villages Rohožník, Sološnica, Kuchyňa, Plavecké Podhradie and Plavecký Mikuláš, i.e. for approximately 8.5 thousand inhabitants of the affected municipalities. The road is also of trans-regional importance as it represents the fastest connection to the D2 motorway for the villages Plavecký Peter, Prievaly, Cerová, Buková, Osuské and Jablonica in the Trnava region. In addition to individual passenger transport, the road is also used by freight and public passenger transport. Due to the unsatisfactory width structure of road III/1113, in 2011, freight traffic of more than 12 tonnes in the direction of Rohožník-Malacky was unidirectional. The situation is solved by a detour through the villages Pernek and Kuchyňa, which negatively affects about 2600 inhabitants of the mentioned villages. Road III/1113 is a strategic connection to the rest of the road network for several production plants of companies operating in the area. The key task of road III/1113 Rohožník – Malacky is, in particular, to ensure a rapid connection to the TEN-T and direct entry to the European Union’s Internal Market. The reconstructed road III/1113 between Malacky and Rohožník is the most beneficial link between the municipalities concerned in the region with the district town of Malacky and with the D2 motorway in terms of time and distance and thus also in terms of environmental impact. The modernisation of road III/1113 will reduce the operational costs for its repair and maintenance. In terms of measurable indicators, the aim of the project is to reconstruct 7,787 km of road and gain time savings in road transport on road III/1113 Rohožník-Malacky worth EUR 20897 towards the end of the project implementation, and this value increases annually in terms of the CBA. (English)
28 September 2021
0 references