Reconstruction of primary heat distribution to VS4 and VS5 in the housing estate North (Q3107668): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claim: co-financing rate (P837): 0.75 percent)
Property / co-financing rate
0.75 percent
Amount0.75 percent
Unitpercent
 
Property / co-financing rate: 0.75 percent / rank
Normal rank
 

Revision as of 10:55, 27 September 2021

Project Q3107668 in Slovakia
Language Label Description Also known as
English
Reconstruction of primary heat distribution to VS4 and VS5 in the housing estate North
Project Q3107668 in Slovakia

    Statements

    0 references
    175,234.61 Euro
    0 references
    233,646.15 Euro
    0 references
    4 January 2021
    0 references
    11 January 2021
    0 references
    Prievidzské tepelné hospodárstvo, a.s. (v skratke PTH, a.s.)
    0 references
    0 references

    48°46'10.20"N, 18°35'30.23"E
    0 references
    Hlavným cieľom predkladaného projektu je zvýšenie účinnosti systému CZT na sídlisku Sever v Prievidzi prostredníctvom rekonštrukcie časti tepelných rozvodov k okrskovým výmenníkovým staniciam VS4 a VS5. Tým sa dosiahne jeho optimalizácia, prispôsobenie zníženému dopytu po využiteľnom teple a vytvoria sa predpoklady na zníženie spotreby primárnej energie.Špecifickým cieľom projektu je zníženie strát tepla a úspora PEZ v systéme CZT v Prievidzi prostredníctvom rekonštrukcie a modernizácie časti rozvodov na sídlisku Sever. Predmetom projektu je rekonštrukcia podzemných tepelných rozvodov - horúcovodných primárnych prípojok na dvojrúrové z predizolovaných oceľových rúr, so zabudovaným monitorovacím systémom, umožňujúcim lokalizáciu prípadnej poruchy na potrubí. Projekt bude realizovaný prostredníctvom 1 hlavnej aktivity „Výstavba, rekonštrukcia a modernizácia rozvodov tepla“.  Dĺžka realizácie projektu je 8 mesiacov, s predpokladaným začiatkom 04/2021 a ukončením 11/2021.Na základe energetického auditu bol stanovený potenciál úspor tepla znížením tepelných strát rozvodov tepla a z toho vyplývajúci potenciál úspor primárnych energetických zdrojov. Projekt má v dôsledku úspory PEZ i CO2 priaznivý dopad na životné prostredie Projektom budú dosiahnuté nasledovné merateľné ukazovatele:P0414 Počet systémov centralizovaného zásobovania teplom s vyššou účinnosťou: 1P0655 Úspora PEZ v systémoch centralizovaného zásobovania teplom: 1 071,226 MWh/rokP0103 Odhadované ročné zníženie emisií skleníkových plynov: 354,493 tekvCO2/rok. (Slovak)
    0 references
    The main objective of the present project is to increase the efficiency of the CZT system at the housing estate North in Prievidza through the reconstruction of part of the heat distribution to the precinct exchanger stations VS4 and VS5. This will achieve its optimisation, adaptation to the reduced demand for useful heat and create the prerequisites for reducing primary energy consumption.The specific objective of the project is to reduce heat loss and save PEZ in the CZT system in Prievidza through reconstruction and modernisation of part of distribution in the North settlement. The subject of the project is the reconstruction of underground thermal distributions – hot water primary connections to two-tubes of pre-insulated steel pipes, with built-in monitoring system, allowing the localisation of possible malfunctions on the pipes. The project will be implemented through 1 main activity “Construction, reconstruction and modernisation of heat distribution systems”.  The duration of the implementation of the project is 8 months, with the expected beginning of 04/2021 and the end of 11/2021. Based on the energy audit, the potential for heat savings by reducing heat loss of heat distribution and the resulting primary energy saving potential was determined. The project has a positive impact on the environment due to the saving of both PEZ and CO2 The project will achieve the following measurable ukazovatele:P0414 Number of district heating systems with higher efficiency: 1P0655 Saving of PEZs in district heating systems: 1071,226 MWh/yearP0103 Estimated annual greenhouse gas emission reductions: 354,493 pumpCO2/year. (English)
    15 September 2021
    0 references

    Identifiers

    310041AXS3
    0 references