Slovak Republic, completion of ilina Teplička marshalling station and downstream railway infrastructure in node ilina – design documentation of DSP, DRS and DVZ (Q3100654): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
(‎Removed claims)
Property / beneficiary name (string)
Železnice Slovenskej republiky
 
Property / beneficiary name (string): Železnice Slovenskej republiky / rank
Normal rank
 
Property / summary
Predmetom projektu je spracovanie projektovej dokumentácie k projektu „ŽSR, dostavba zriaďovacej stanice Žilina Teplička a nadväzujúcej železničnej infraštruktúry v uzle Žilina" v členení:• dokumentácia pre stavebné povolenie vrátane inžinierskej činnosti;• dokumentácia pre realizáciu stavby vrátane posúdenia TSI;• dokumentácia pre výber zhotoviteža. Vypracovaná dokumentácia a následná stavba vytvorí globálny projekt "ŽSR, dostavba zriaďovacej stanice Žilina Teplička a nadväzujúcej železničnej infraštruktúry v uzle Žilina", ktorý je hlavne zameraný na modernizáciu železničného uzla Žilina. Modernizácia je nevyhnutným predpokladom pre plnohodnotné vytvorenie tranzitného železničného koridoru v smere sever - juh spĺňajúceho požiadavky Technických špecifikácií pre interoperabilitu konvenčných železničných systémov Európy. Táto modernizácia je taktiež nevyhnutným medzníkom pri prechode prevádzky na ekonomicky výhodnejšiu striedavú elektrickú trakciu s jednofázovým systémov 25 kV, 50 Hz a pre plnohodnotný prechod na dispečerské riadenie zmodernizovaných traových úsekov. Pre možnos budúcej modernizácie infraštruktúry je momentálne potrebné vypracova projektovú dokumentáciu. Projekt plynulo nadväzuje na spracovanie projektovej prípravy predmetnej stavby s podporou Operačného programu Doprava 2007 - 2013. (Slovak)
 
Property / summary: Predmetom projektu je spracovanie projektovej dokumentácie k projektu „ŽSR, dostavba zriaďovacej stanice Žilina Teplička a nadväzujúcej železničnej infraštruktúry v uzle Žilina" v členení:• dokumentácia pre stavebné povolenie vrátane inžinierskej činnosti;• dokumentácia pre realizáciu stavby vrátane posúdenia TSI;• dokumentácia pre výber zhotoviteža. Vypracovaná dokumentácia a následná stavba vytvorí globálny projekt "ŽSR, dostavba zriaďovacej stanice Žilina Teplička a nadväzujúcej železničnej infraštruktúry v uzle Žilina", ktorý je hlavne zameraný na modernizáciu železničného uzla Žilina. Modernizácia je nevyhnutným predpokladom pre plnohodnotné vytvorenie tranzitného železničného koridoru v smere sever - juh spĺňajúceho požiadavky Technických špecifikácií pre interoperabilitu konvenčných železničných systémov Európy. Táto modernizácia je taktiež nevyhnutným medzníkom pri prechode prevádzky na ekonomicky výhodnejšiu striedavú elektrickú trakciu s jednofázovým systémov 25 kV, 50 Hz a pre plnohodnotný prechod na dispečerské riadenie zmodernizovaných traových úsekov. Pre možnos budúcej modernizácie infraštruktúry je momentálne potrebné vypracova projektovú dokumentáciu. Projekt plynulo nadväzuje na spracovanie projektovej prípravy predmetnej stavby s podporou Operačného programu Doprava 2007 - 2013. (Slovak) / rank
Normal rank
 
Property / summary
The subject of the project is the preparation of project documentation for the project of the Slovak Republic, the completion of the marshalling station ilina Teplička and the subsequent railway infrastructure in the ilina node" in the breakdown: documentation for the building permit, including the inieric activity; documentation for the implementation of the construction, including the assessment of the TSI; documentation for the selection of the contractor. The prepared documentation and subsequent construction will create a global project “SR, completion of the ilina Teplička marshalling station and the subsequent railway infrastructure in the ilina node”, which is mainly focused on the modernisation of the ilina railway node. Modernisation is a prerequisite for the full establishment of a north-south transit corridor meeting the technical specifications for the interoperability of Europe’s conventional rail systems. This modernisation is also a necessary milestone in the transition of operation to economically efficient alternating electric traction with single-phase 25 kV, 50 Hz systems and for a full transition to the dispatcher control of upgraded traction sections. For the future modernisation of the infrastructure, it is now necessary to prepare project documentation. The project seamlessly follows the processing of the project preparation of the building in question with the support of the Operational Programme Transport 2007-2013. (English)
 
Property / summary: The subject of the project is the preparation of project documentation for the project of the Slovak Republic, the completion of the marshalling station ilina Teplička and the subsequent railway infrastructure in the ilina node" in the breakdown: documentation for the building permit, including the inieric activity; documentation for the implementation of the construction, including the assessment of the TSI; documentation for the selection of the contractor. The prepared documentation and subsequent construction will create a global project “SR, completion of the ilina Teplička marshalling station and the subsequent railway infrastructure in the ilina node”, which is mainly focused on the modernisation of the ilina railway node. Modernisation is a prerequisite for the full establishment of a north-south transit corridor meeting the technical specifications for the interoperability of Europe’s conventional rail systems. This modernisation is also a necessary milestone in the transition of operation to economically efficient alternating electric traction with single-phase 25 kV, 50 Hz systems and for a full transition to the dispatcher control of upgraded traction sections. For the future modernisation of the infrastructure, it is now necessary to prepare project documentation. The project seamlessly follows the processing of the project preparation of the building in question with the support of the Operational Programme Transport 2007-2013. (English) / rank
Normal rank
 
Property / summary: The subject of the project is the preparation of project documentation for the project of the Slovak Republic, the completion of the marshalling station ilina Teplička and the subsequent railway infrastructure in the ilina node" in the breakdown: documentation for the building permit, including the inieric activity; documentation for the implementation of the construction, including the assessment of the TSI; documentation for the selection of the contractor. The prepared documentation and subsequent construction will create a global project “SR, completion of the ilina Teplička marshalling station and the subsequent railway infrastructure in the ilina node”, which is mainly focused on the modernisation of the ilina railway node. Modernisation is a prerequisite for the full establishment of a north-south transit corridor meeting the technical specifications for the interoperability of Europe’s conventional rail systems. This modernisation is also a necessary milestone in the transition of operation to economically efficient alternating electric traction with single-phase 25 kV, 50 Hz systems and for a full transition to the dispatcher control of upgraded traction sections. For the future modernisation of the infrastructure, it is now necessary to prepare project documentation. The project seamlessly follows the processing of the project preparation of the building in question with the support of the Operational Programme Transport 2007-2013. (English) / qualifier
point in time: 15 September 2021
Timestamp+2021-09-15T00:00:00Z
Timezone+00:00
CalendarGregorian
Precision1 day
Before0
After0
 

Revision as of 13:48, 24 September 2021

Project Q3100654 in Slovakia
Language Label Description Also known as
English
Slovak Republic, completion of ilina Teplička marshalling station and downstream railway infrastructure in node ilina – design documentation of DSP, DRS and DVZ
Project Q3100654 in Slovakia

    Statements

    0 references
    3,334,660.19 Euro
    0 references
    3,923,129.63 Euro
    0 references
    0.85 percent
    0 references
    1 December 2015
    0 references
    1 February 2022
    0 references
    0 references
    0 references

    48°8'54.96"N, 17°6'27.90"E
    0 references

    Identifiers

    311011C277
    0 references