Gajary – waste collection yard (Q3100648): Difference between revisions
Jump to navigation
Jump to search
(Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string) |
(Removed claims) |
||||||||||||||
Property / beneficiary name (string) | |||||||||||||||
Property / beneficiary name (string): Obec Gajary / rank | |||||||||||||||
Property / summary | |||||||||||||||
Property / summary: Obec Gajary prevádzkuje zberný dvor, ktorý vybudovala z vlastných zdrojov. Súčasné kapacity zberného dvora sú nedostatočné a v nevyhovujúcom technickom stave.Hlavným ciežom projektu je zlepenie systému separovaného zberu v obci Gajary dosiahnuté zvýením kapacít pre triedenie komunálnych odpadov. V rámci projektu uvaujeme s investíciou do infratruktúry zberného dvora ako aj s obstaraním strojov a zariadení potrebných pre efektívny chod zberného dvora. Na zbernom dvore odpadov sa budú zbiera rôzne druhy odpadov podža jednotlivých katalógových čísiel v zmysle vyhláky č. 284/2001 Z.z., ktorou sa ustanovuje katalóg odpadov.Vzhžadom na narastajúci objem odpadov a potrebu zvýi kapacity pre triedenie komunálneho odpadu, je nevyhnutné dovybavi existujúci zberný dvor ďalími nádobami a strojmi. Nakožko existujúci dvor v súčasnosti nie je napojený na elektrickú energiu, v rámci projektu sa uvauje s jej zabudovaním a tie ďalími stavebnými úpravami v súlade s projektovou dokumentáciou. Proces separácie je vyhodnotený ako nedostatočný a nepribliuje sa k potenciálnym monostiam vyseparova z komunálnych odpadov väčie mnostvo zhodnotitežných zloiek. (Slovak) / rank | |||||||||||||||
Property / summary | |||||||||||||||
Property / summary: The municipality of Gajary operates a collection yard, which it built from its own resources. The current capacity of the collection court is insufficient and in poor technical condition.The main objective of the project is to improve the system of separate collection in the municipality of Gajary achieved by increasing the capacity for sorting municipal waste. As part of the project, we consider with investment in the infrastructure of the collection yard as well as the acquisition of the machines and equipment necessary for the efficient operation of the collection yard. Different types of waste will be collected at the waste collection yard under individual catalogue numbers in the sense of the digress No. 284/2001 Coll., which establishes a waste catalogue.In view of the increasing volume of waste and the need to increase capacity for sorting municipal waste, it is necessary to retrofitting the existing collection yard with other containers and machines. As the existing yard is currently not connected to electricity, the project is considered with its installation and other building modifications in accordance with the project documentation. The separation process is assessed to be insufficient and is not close to the potential possibilities of evaporating municipal waste by a large number of recovery factors. (English) / rank | |||||||||||||||
Property / summary: The municipality of Gajary operates a collection yard, which it built from its own resources. The current capacity of the collection court is insufficient and in poor technical condition.The main objective of the project is to improve the system of separate collection in the municipality of Gajary achieved by increasing the capacity for sorting municipal waste. As part of the project, we consider with investment in the infrastructure of the collection yard as well as the acquisition of the machines and equipment necessary for the efficient operation of the collection yard. Different types of waste will be collected at the waste collection yard under individual catalogue numbers in the sense of the digress No. 284/2001 Coll., which establishes a waste catalogue.In view of the increasing volume of waste and the need to increase capacity for sorting municipal waste, it is necessary to retrofitting the existing collection yard with other containers and machines. As the existing yard is currently not connected to electricity, the project is considered with its installation and other building modifications in accordance with the project documentation. The separation process is assessed to be insufficient and is not close to the potential possibilities of evaporating municipal waste by a large number of recovery factors. (English) / qualifier | |||||||||||||||
|
Revision as of 13:48, 24 September 2021
Project Q3100648 in Slovakia
Language | Label | Description | Also known as |
---|---|---|---|
English | Gajary – waste collection yard |
Project Q3100648 in Slovakia |
Statements
257,857.35 Euro
0 references
303,361.59 Euro
0 references
0.85 percent
0 references
1 February 2017
0 references
1 February 2021
0 references
Identifiers
310011B180
0 references