Improving the effectiveness of treatment of civilisation diseases caused by cardiovascular diseases and improving patient safety through the purchase of medical equipment and construction works related to the reconstruction of the unit of systemic rehabilitation with the neurological rehabilitation subdivision and the construction of an additional entrance to the Hospital with stairs and lift (Q2709707): Difference between revisions
Jump to navigation
Jump to search
(Changed claim: budget (P474): 251,476.3 euro) |
(Changed label, description and/or aliases in fr, and other parts: Adding French translations) |
||||||||||||||
label / fr | label / fr | ||||||||||||||
Améliorer l ’ efficacité du traitement des maladies de civilisation causées par des maladies cardiovasculaires et améliorer la sécurité des patients grâce à l ’ achat de matériel médical et de travaux de construction liés à la reconstruction de l ’ unité de réhabilitation systémique avec la subdivision de réhabilitation neurologique et la construction d ’ une entrée supplémentaire de l ’ hôpital | |||||||||||||||
Property / summary | |||||||||||||||
L’objet du projet est l’achat du matériel médical spécialisé nécessaire au traitement des maladies de civilisation causées par des maladies cardiovasculaires à l’unité de réadaptation systémique avec sous-unité et physiothérapie neurologiques, ainsi que la reconstruction de la branche située au rez-de-chaussée du bâtiment — Pavillon «B» en ce qui concerne l’adaptation de parties de chacune des 5 chambres à une salle de bain avec toilettes, la reconstruction de deux salles d’hôpital inutilisées dans une salle de repos avec un nœud sanitaire et l’apport d’installations de gaz médicaux directement aux panneaux de chevet. Le projet réalisera une installation photovoltaïque soutenant l’installation électrique. Afin de réorienter le mouvement actuel des patients et du personnel médical d’autres branches, qui, en raison de l’absence d’autres possibilités, passent à des traitements d’hydrothérapie par l’intermédiaire de l’unité de réadaptation systémique, il est prévu de construire une entrée supplémentaire de l’hôpital avec des escaliers et un ascenseur pour les personnes handicapées. Le projet sera mis en œuvre à Korfantów à ul. Libération 11 (plot no 483/14). Les dépenses d’investissement pour l’achat de matériel médical encourus dans le cadre de la contribution propre et du cofinancement prévu s’élèveront à 180 802,50 PLN. (French) | |||||||||||||||
Property / summary: L’objet du projet est l’achat du matériel médical spécialisé nécessaire au traitement des maladies de civilisation causées par des maladies cardiovasculaires à l’unité de réadaptation systémique avec sous-unité et physiothérapie neurologiques, ainsi que la reconstruction de la branche située au rez-de-chaussée du bâtiment — Pavillon «B» en ce qui concerne l’adaptation de parties de chacune des 5 chambres à une salle de bain avec toilettes, la reconstruction de deux salles d’hôpital inutilisées dans une salle de repos avec un nœud sanitaire et l’apport d’installations de gaz médicaux directement aux panneaux de chevet. Le projet réalisera une installation photovoltaïque soutenant l’installation électrique. Afin de réorienter le mouvement actuel des patients et du personnel médical d’autres branches, qui, en raison de l’absence d’autres possibilités, passent à des traitements d’hydrothérapie par l’intermédiaire de l’unité de réadaptation systémique, il est prévu de construire une entrée supplémentaire de l’hôpital avec des escaliers et un ascenseur pour les personnes handicapées. Le projet sera mis en œuvre à Korfantów à ul. Libération 11 (plot no 483/14). Les dépenses d’investissement pour l’achat de matériel médical encourus dans le cadre de la contribution propre et du cofinancement prévu s’élèveront à 180 802,50 PLN. (French) / rank | |||||||||||||||
Normal rank | |||||||||||||||
Property / summary: L’objet du projet est l’achat du matériel médical spécialisé nécessaire au traitement des maladies de civilisation causées par des maladies cardiovasculaires à l’unité de réadaptation systémique avec sous-unité et physiothérapie neurologiques, ainsi que la reconstruction de la branche située au rez-de-chaussée du bâtiment — Pavillon «B» en ce qui concerne l’adaptation de parties de chacune des 5 chambres à une salle de bain avec toilettes, la reconstruction de deux salles d’hôpital inutilisées dans une salle de repos avec un nœud sanitaire et l’apport d’installations de gaz médicaux directement aux panneaux de chevet. Le projet réalisera une installation photovoltaïque soutenant l’installation électrique. Afin de réorienter le mouvement actuel des patients et du personnel médical d’autres branches, qui, en raison de l’absence d’autres possibilités, passent à des traitements d’hydrothérapie par l’intermédiaire de l’unité de réadaptation systémique, il est prévu de construire une entrée supplémentaire de l’hôpital avec des escaliers et un ascenseur pour les personnes handicapées. Le projet sera mis en œuvre à Korfantów à ul. Libération 11 (plot no 483/14). Les dépenses d’investissement pour l’achat de matériel médical encourus dans le cadre de la contribution propre et du cofinancement prévu s’élèveront à 180 802,50 PLN. (French) / qualifier | |||||||||||||||
point in time: 4 December 2021
|
Revision as of 11:10, 4 December 2021
Project Q2709707 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Improving the effectiveness of treatment of civilisation diseases caused by cardiovascular diseases and improving patient safety through the purchase of medical equipment and construction works related to the reconstruction of the unit of systemic rehabilitation with the neurological rehabilitation subdivision and the construction of an additional entrance to the Hospital with stairs and lift |
Project Q2709707 in Poland |
Statements
961,560.29 zloty
0 references
1,131,247.42 zloty
0 references
85.0 percent
0 references
10 July 2020
0 references
30 January 2022
0 references
OPOLSKIE CENTRUM REHABILITACJI W KORFANTOWIE SP. Z O.O.
0 references
Przedmiotem projektu jest zakup specjalistycznego sprzętu medycznego niezbędnego do leczenia chorób cywilizacyjnych wywołanych schorzeniami sercowo - naczyniowymi na oddział rehabilitacji ogólnoustrojowej z pododdziałem neurologicznym i dział fizjoterapii, a ponadto przebudowa oddziału znajdującego się na parterze budynku - pawilon "B" w zakresie adaptacji części każdej z 5 sal na łazienkę z WC, przebudowania dwóch nieużytkowanych pomieszczeń szpitalnych na salę chorych wraz z węzłem sanitarnym oraz doprowadzenie instalacji gazów medycznych bezpośrednio do paneli przyłóżkowych. W ramach projektu wykonana zostanie instalacja fotowoltaiczna wspomagająca instalację elektryczną. W celu przekierowania dotychczasowego ruchu pacjentów oraz personelu medycznego innych oddziałów, który w związku z brakiem innej możliwości przemieszczają się na zabiegi z hydroterapii przez oddział rehabilitacji ogólnoustrojowej, zaplanowano budowę dodatkowego wejścia do Szpitala wraz ze schodami i windą dla osób niepełnosprawnych. Przedsięwzięcie realizowane będzie w Korfantowie przy ul. Wyzwolenia 11 (działka nr 483/14). Poniesione w ramach wkładu własnego oraz planowanego dofinansowania nakłady inwestycyjne na zakup aparatury medycznej wyniosą 180 802,50 zł. (Polish)
0 references
The subject of the project is the purchase of specialised medical equipment necessary for the treatment of civilisation diseases caused by cardiovascular diseases to the unit of systemic rehabilitation with neurological sub-unit and physiotherapy department, as well as the reconstruction of the branch located on the ground floor of the building – Pavilion “B” in terms of adapting parts of each of the 5 rooms to a bathroom with toilet, rebuilding two unused hospital rooms into a sick room with a sanitary node and bringing medical gas installations directly to the bedside panels. The project will carry out a photovoltaic installation supporting the electrical installation. In order to redirect the current movement of patients and medical staff of other branches, who, due to the lack of other possibilities, move to hydrotherapy treatments through the unit of systemic rehabilitation, it is planned to build an additional entrance to the Hospital with stairs and lift for people with disabilities. The project will be implemented in Korfantów at ul. Liberation 11 (plot No 483/14). The investment expenditure for the purchase of medical equipment incurred as part of the own contribution and the planned co-financing will amount to PLN 180 802.50. (English)
8 July 2021
0 references
L’objet du projet est l’achat du matériel médical spécialisé nécessaire au traitement des maladies de civilisation causées par des maladies cardiovasculaires à l’unité de réadaptation systémique avec sous-unité et physiothérapie neurologiques, ainsi que la reconstruction de la branche située au rez-de-chaussée du bâtiment — Pavillon «B» en ce qui concerne l’adaptation de parties de chacune des 5 chambres à une salle de bain avec toilettes, la reconstruction de deux salles d’hôpital inutilisées dans une salle de repos avec un nœud sanitaire et l’apport d’installations de gaz médicaux directement aux panneaux de chevet. Le projet réalisera une installation photovoltaïque soutenant l’installation électrique. Afin de réorienter le mouvement actuel des patients et du personnel médical d’autres branches, qui, en raison de l’absence d’autres possibilités, passent à des traitements d’hydrothérapie par l’intermédiaire de l’unité de réadaptation systémique, il est prévu de construire une entrée supplémentaire de l’hôpital avec des escaliers et un ascenseur pour les personnes handicapées. Le projet sera mis en œuvre à Korfantów à ul. Libération 11 (plot no 483/14). Les dépenses d’investissement pour l’achat de matériel médical encourus dans le cadre de la contribution propre et du cofinancement prévu s’élèveront à 180 802,50 PLN. (French)
4 December 2021
0 references
Identifiers
RPOP.10.01.01-16-0010/20
0 references