Reduction of low emissions by replacing the heating device with a central heating installation in a multi-family building at ul. Daszyński 1 in Wyszków (Q2708125): Difference between revisions
Jump to navigation
Jump to search
(Changed claim: EU contribution (P835): 29,350.83 euro) |
(Changed claim: budget (P474): 36,688.54 euro) |
||
Property / budget: 36,688.54 Euro / rank | Property / budget: 36,688.54 Euro / rank | ||
Preferred rank |
Revision as of 21:52, 21 September 2021
Project Q2708125 in Poland
Language | Label | Description | Also known as |
---|---|---|---|
English | Reduction of low emissions by replacing the heating device with a central heating installation in a multi-family building at ul. Daszyński 1 in Wyszków |
Project Q2708125 in Poland |
Statements
132,032.53 zloty
0 references
165,040.66 zloty
0 references
80.0 percent
0 references
8 May 2019
0 references
30 July 2020
0 references
GMINA WYSZKÓW
0 references
Przedmiotem projektu jest wymiana urządzenia grzewczego wraz z instalacją c.o. w budynku przy ul. Daszyńskiego 1 w Wyszkowie. Zakres przedsięwzięcia obejmuje następujące zadania: 1. Opracowanie Studium Wykonalności. 2. Prace termomodernizacyjne i montaż kotła gazowego (w tym: wykonanie instalacji wodociągowej, wykonanie instalacji C.O i kotłowni, roboty demontażowe). 3. Nadzór inwestorski. 4. Promocja projektu. Realizacja ww. zadań będzie zmierzać do osiągnięcia celu głównego, tj. redukcji emisji zanieczyszczeń powietrza na obszarze Gminy Wyszków poprzez poprawę efektywności grzewczej budynku przy ul. Daszyńskiego 1 w Wyszkowie. Grupę docelową przedsięwzięcia stanowią mieszkańcy budynku objętego wsparciem, wszyscy mieszkańcy Gminy Wyszków, sama gmina jako obszar, wraz z jej zasobami środowiskowymi oraz operator obiektu - WTBS Sp. z o.o. W wyniku realizacji projektu i wymiany lokalnych pieców węglowych na kocioł gazowy, osiągnięty zostanie znaczny stopień redukcji emisji CO2, tj. o co najmniej 30% w stosunku do aktualnie stosowanej instalacji (tj. 72,22% wg wyliczenia efektu ekologicznego w audycie energetycznym). Również zgodnie z zapisami audytu, zapotrzebowanie budynku na nieodnawialną energię pierwotną do ogrzewania, wentylacji, chłodzenia, przygotowania ciepłej wody użytkowej wyniesie 133,5 kWh/(m2 x rok). Projekt zostanie zrealizowany na obszarze Gminy Wyszków, która zalicza się do obszarów o liczbie do 300 tys. mieszkańców oraz odznaczających się przekroczeniami dopuszczalnego poziomu pyłu PM10. Przedmiotowa inwestycja będzie miała charakter rewitalizacyjny i wynika bezpośrednio z zapisów „Lokalnego programu rewitalizacji Gminy Wyszków na lata 2018-2023”. Przedmiot projektu realizuje także działania inwestycyjne przyjęte w „Planie Gospodarki Niskoemisyjnej dla Gminy Wyszków”. Zamierzone prace nie wymagają uzyskania pozwolenia na budowę oraz zgłoszenia prac. Za prawidłową realizację projektu odpowiedzialni będą pracownicy Urzędu Miejskiego w Wyszkowie. (Polish)
0 references
The object of the project is the replacement of the heating device and the installation of the central heating unit in the building at ul. Daszyński 1 in Wyszków. The scope of the project includes the following tasks: 1. Study of Feasibility Study. 2. Thermomodernisation and installation of a gas boiler (including: construction of a water supply system, installation of C.O. and boiler rooms, dismantling works). 3. Investor supervision. 4. Promotion of the project. The implementation of the above-mentioned tasks will aim at achieving the main objective of reducing air pollutant emissions in the area of Wyszków Municipality by improving the heating efficiency of the building at ul. Daszyński 1 in Wyszków. The target group of the project is residents of the supported building, all residents of Wyszków Municipality, the municipality itself as an area, together with its environmental resources, and the operator of the facility – WTBS Sp. z o.o. As a result of the project and the replacement of local coal furnaces for a gas boiler, a significant reduction in CO2 emissions will be achieved, i.e. by at least 30 % compared to the current installation (i.e. 72.22 % according to the calculation of the ecological effect in the energy audit). Also according to the audit, the building needs for non-renewable primary energy for heating, ventilation, cooling, hot water preparation will be 133,5 kWh/(m² x year). The project will be carried out in the area of Wyszków Municipality, which is part of areas with up to 300,000 inhabitants and which are characterised by exceedances of the PM10 limit. The investment in question will be revitalised and results directly from the provisions of the “Local Revitalisation Programme of the Municipality of Wyszków for the period 2018-2023”. The subject of the project also implements the investment measures adopted in the “Low-carbon Economy Plan for the Municipality of Wyszków”. The intended works do not require obtaining a building permit and notification of works. The employees of the Municipal Office in Wyszków will be responsible for the correct implementation of the project. (English)
7 July 2021
0 references
Identifiers
RPMA.04.03.01-14-D142/19
0 references