Reconstruction of the boiler room for biomass in the municipality of Bobrov (Q3110807): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed label, description and/or aliases in en: translated_label)
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
Property / contained in NUTS
 
Property / contained in NUTS: Žilina Region / rank
 
Normal rank

Revision as of 01:04, 16 September 2021

Project Q3110807 in Slovakia
Language Label Description Also known as
English
Reconstruction of the boiler room for biomass in the municipality of Bobrov
Project Q3110807 in Slovakia

    Statements

    0 references
    126,443.33 Euro
    0 references
    148,756.86 Euro
    0 references
    0.85 percent
    0 references
    5 January 2019
    0 references
    12 January 2019
    0 references
    Obec Bobrov
    0 references

    49°25'40.87"N, 19°32'34.30"E
    0 references
    Obec Bobrov sa nachádza okrese Námestovo v Žilinskom kraji. V súčasnosti žije v obci 1685 obyvateľov. Projekt rieši zmenu palivovej základne zdroja tepla v objekte Materskej školy v obci Bobrov z tuhých palív na drevné pelety. Súčasný spôsob vykurovania je z hľadiska súčasných nárokov na tepelnú pohodu prostredia, regulačné možnosti a ekonomický a hospodárnu prevádzku nevyhovujúci. V rámci zmeny palivovej základne dôjde k demontáži existujúcej technológie kotolne a inštalácii novej technológie kotolne na spaľovanie drevných peliet. Hlavná aktivita projektu je „Výstavba zariadení využívajúcich biomasu prostredníctvom rekonštrukcie a modernizácie existujúcich energetických zariadení s maximálnym tepelným príkonom 20 MW na báze fosílnych palív“. Úspešná realizácia projektu so sebou okrem zlepšenia materiálno-technického stavu budovy prinesie tiež i zlepšenie energetickej efektívnosti a zvýšenie energetickej hospodárnosti budovy. (Slovak)
    0 references
    The village of Bobrov is located in the district Námestovo in Žilina region. There are currently 1685 inhabitants in the village. The project solves the change of the fuel base of the heat source in the building of the Maternity School in Bobrov from solid fuels to wood pellets. The current heating method is unsatisfactory in terms of current requirements for the thermal well-being of the environment, regulatory possibilities and economical and economical operation. As part of the change of fuel base, the existing boiler room technology will be dismantled and the new boiler room technology installed for the combustion of wood pellets. The main activity of the project is “Construction of biomass-based installations through the reconstruction and modernisation of existing energy installations with a maximum thermal input of 20 MW based on fossil fuels”. In addition to improving the material and technical condition of the building, the successful implementation of the project will also bring about an improvement in energy efficiency and an increase in the energy performance of the building. (English)
    15 September 2021
    0 references

    Identifiers

    310041P625
    0 references