Construction of infrastructure for non-motorised transport in the territory of the town of Humenné (Q3102042): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Changed an Item: Edited by the materialized bot - inferring region from the coordinates)
(‎Changed an Item: Edited by the beneficiary bot - attach the beneficiary based on the string)
Property / beneficiary
 
Property / beneficiary: Q3120526 / rank
 
Normal rank

Revision as of 21:12, 23 September 2021

Project Q3102042 in Slovakia
Language Label Description Also known as
English
Construction of infrastructure for non-motorised transport in the territory of the town of Humenné
Project Q3102042 in Slovakia

    Statements

    0 references
    105,043.91 Euro
    0 references
    123,581.07 Euro
    0 references
    0.85 percent
    0 references
    1 June 2020
    0 references
    1 May 2021
    0 references
    Mesto Humenné
    0 references
    0 references

    48°56'1.97"N, 21°54'38.59"E
    0 references
    Zámerom predkladaného projektu "Výstavba infraštruktúry pre nemotorovú dopravu na území mesta Humenné" je zvýšenie atraktivity a prepravnej kapacity nemotorovej dopravy - cyklistickej dopravy na celkovom počte prepravovaných osôb a to prostredníctvom dvoch hlavných aktivít, ktoré spočívajú vo výstavbe prepojovacieho cyklochodníka od starého Valaškovského mosta po cyklochodník na hrádzi pri Laborci a doplnkovej cyklistickej infraštruktúry v rámci ktorej sa rieši umiestnenie cyklostojanov s prestrešením a cyklostojanov pozdĺž vybudovaného a plánovaného cyklochodníka. Projekt  vytvorí podmienky pre lepšiu mobilitu obyvatežov mesta tým, že prispeje k dostatočne vybudovanej  a kompaktnej sieti cyklotrás v meste. Ďalej prispeje k zmene dežby prepravnej práce v prospech environmentálne priaznivejších módov dopravy a k zvýšeniu podielu využívania cyklistickej dopravy, čím odžahčí centrá miest  od postupne narastajúcej miery automobilizácie a vytvorí pozitívny environmentálny efekt v podobe zníženia miery znečistenia ovzdušia, hluku a vibrácií.  Projekt je v súlade s oprávnenými aktivitami, nakožko sa bude venova infraštruktúre pre nemotorovú dopravu a propagácii a zvyšovaniu atraktivity cyklistickej dopravy pre verejnos. Predkladaným projektom sa zabezpečí prepojenos existujúcej resp.plánovanej cyklistickej infraštruktúry s občianskou infraštruktúrou, priemyselnou zónou a infraštruktúru verejnej osobnej dopravy. Projekt plne korešponduje s príslušnými strategickými dokumentmi pre oblas dopravy. Meratežnými ukazovatežmi sú: Dĺžka nových úsekov cyklistických komunikácií= 0,2174     km; Počet vytvorených prvkov doplnkovej cyklistickej infraštruktúry= 7. (Slovak)
    0 references
    The aim of the present project “Construction of infrastructure for non-motor transport in the city of Humenné” is to increase the attractiveness and transport capacity of non-motorised transport – cycling on the total number of transported persons through two main activities, which consist of the construction of a connecting cycle pathway from the old Valakovský bridge to the cycle path at the dam near Laborec and the additional cycling infrastructure within which the location of cycling stands with stretching and cycling stalls will be solved along the built and planned cycling pathway. The project will create the conditions for better mobility of the inhabitants of the city by contributing to a sufficiently built and compact network of cycling routes in the city. It will also contribute to a change in the split of transport work in favour of environmentally friendly modes of transport and to an increase in the share of cycling, thus reducing urban centres from a gradually increasing degree of caring and creating a positive environmental effect in terms of reducing air pollution, noise and vibration.  The project is in line with the eligible activities, as the infrastructure for non-motor transport and the promotion and attractiveness of cycling to the public will be developed. This project will ensure the interconnection of existing or planned cycling infrastructure with civil infrastructure, industrial zone and public passenger transport infrastructure. The project fully corresponds with the relevant strategy papers for the transport area. The measurement indicators are: Length of new cycling road sections = 0.2174 km; Number of additional cycle infrastructure elements created= 7. (English)
    15 September 2021
    0 references

    Identifiers

    302011M332
    0 references