Refurbishment of the entrance work and maturation pond of the Almeirim/Alpiarça treatment plant (Q2982019): Difference between revisions

From EU Knowledge Graph
Jump to navigation Jump to search
(‎Removed claim: co-financing rate (P837): 85.0 percent, Removing co-finance rate from projects in portugal)
(‎Removed claim: budget (P474): 196,854.22 euro)
Property / budget
196,854.22 Euro
Amount196,854.22 Euro
UnitEuro
 
Property / budget: 196,854.22 Euro / rank
Normal rank
 

Revision as of 10:56, 20 October 2021

Project Q2982019 in Portugal
Language Label Description Also known as
English
Refurbishment of the entrance work and maturation pond of the Almeirim/Alpiarça treatment plant
Project Q2982019 in Portugal

    Statements

    0 references
    30 June 2016
    0 references
    21 April 2017
    0 references
    AR - ÁGUAS DO RIBATEJO, E.I.M., S.A.
    0 references
    0 references
    0 references

    39°15'35.78"N, 8°35'4.24"W
    0 references
    Pretende-se implementar uma operação de pré-tratamento do efluente e ainda a instalação de um sistema de dosagem de ácido clorídrico diluído na superfície da lagoa de maturação, de modo a evitar a proliferação de algas. A operação garante assim um adequado tratamento dos efluentes recolhidos para uma população de 25006 habitantes servidos e contribui para a melhoria da qualidade das massas de água. (Portuguese)
    0 references
    It is intended to implement a pre-treatment operation of the effluent and the installation of a diluted hydrochloric acid dosage system on the surface of the ripening pond in order to avoid algae proliferation. The operation thus ensures an adequate treatment of the effluents collected for a population of 25006 inhabitants served and contributes to the improvement of the quality of the water bodies. (English)
    9 July 2021
    0 references
    Alpiarça, Alpiarça
    0 references

    Identifiers

    POSEUR-03-2012-FC-000040
    0 references